Table of Contents

 

 

 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

 


 

FORM 10-Q

 

(Mark One)

 

x    QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended March 31, 2013

 

OR

 

o     TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from              to             

 

Commission File
Number

 

Exact Name of Each Registrant as specified in its
charter; State of Incorporation; Address; and
Telephone Number

 

IRS Employer
Identification No.

1-8962

 

PINNACLE WEST CAPITAL CORPORATION

(an Arizona corporation)

400 North Fifth Street, P.O. Box 53999

Phoenix, Arizona 85072-3999

(602) 250-1000

 

86-0512431

1-4473

 

ARIZONA PUBLIC SERVICE COMPANY

(an Arizona corporation)

400 North Fifth Street, P.O. Box 53999

Phoenix, Arizona 85072-3999

(602) 250-1000

 

86-0011170

 

Indicate by check mark whether each registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

PINNACLE WEST CAPITAL CORPORATION

Yes  x   No  o

ARIZONA PUBLIC SERVICE COMPANY

Yes  x   No  o

 

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).

PINNACLE WEST CAPITAL CORPORATION

Yes  x   No  o

ARIZONA PUBLIC SERVICE COMPANY

Yes  x   No  o

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

PINNACLE WEST CAPITAL CORPORATION

Large accelerated filer x

Accelerated filer o

Non-accelerated filer o

Smaller reporting company o

ARIZONA PUBLIC SERVICE COMPANY

Large accelerated filer o

Accelerated filer o

Non-accelerated filer x

Smaller reporting company o

 

Indicate by check mark whether each registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

PINNACLE WEST CAPITAL CORPORATION

Yes  o   No  x

ARIZONA PUBLIC SERVICE COMPANY

Yes  o   No  x

 

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date.

PINNACLE WEST CAPITAL CORPORATION

Number of shares of common stock, no par value, outstanding as of April 26, 2013:  109,947,418

ARIZONA PUBLIC SERVICE COMPANY

Number of shares of common stock, $2.50 par value, outstanding as of April 26, 2013:  71,264,947

 

Arizona Public Service Company meets the conditions set forth in General Instruction H(1)(a) and (b) of Form 10-Q and is therefore filing this form with the reduced disclosure format allowed under that General Instruction.

 

 

 



Table of Contents

 

TABLE OF CONTENTS

 

 

 

Page

 

 

 

Forward-Looking Statements

 

2

Part I

 

 

 

3

Item 1.

 

Financial Statements

 

3

 

 

Pinnacle West Capital Corporation

 

3

 

 

Arizona Public Service Company

 

42

Item 2.

 

Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

50

Item 3.

 

Quantitative and Qualitative Disclosures About Market Risk

 

67

Item 4.

 

Controls and Procedures

 

67

 

 

 

 

 

Part II

 

 

 

69

Item 1.

 

Legal Proceedings

 

69

Item 1A.

 

Risk Factors

 

69

Item 2.

 

Unregistered Sales of Equity Securities and Use of Proceeds

 

69

Item 5.

 

Other Information

 

70

Item 6.

 

Exhibits

 

71

Signatures

 

74

 

This combined Form 10-Q is separately provided by Pinnacle West Capital Corporation (“Pinnacle West”) and Arizona Public Service Company (“APS”).  Any use of the words “Company,” “we,” and “our” refer to Pinnacle West.  Each registrant is providing on its own behalf all of the information contained in this Form 10-Q that relates to such registrant and, where required, its subsidiaries.  Except as stated in the preceding sentence, neither registrant is providing any information that does not relate to such registrant, and therefore makes no representation as to any such information.  The information required with respect to each company is set forth within the applicable items.  Item 1 of this report includes Condensed Consolidated Financial Statements of Pinnacle West and Condensed Consolidated Financial Statements of APS.  Item 1 also includes Notes to Pinnacle West’s Condensed Consolidated Financial Statements, the majority of which also relate to APS, and Supplemental Notes, which only relate to APS’s Condensed Consolidated Financial Statements.

 



Table of Contents

 

FORWARD-LOOKING STATEMENTS

 

This document contains forward-looking statements based on current expectations.  These forward-looking statements are often identified by words such as “estimate,” “predict,” “may,” “believe,” “plan,” “expect,” “require,” “intend,” “assume” and similar words.  Because actual results may differ materially from expectations, we caution readers not to place undue reliance on these statements.  A number of factors could cause future results to differ materially from historical results, or from outcomes currently expected or sought by Pinnacle West or APS.  In addition to the Risk Factors described in Part I, Item 1A of the Pinnacle West/APS Annual Report on Form 10-K for the fiscal year ended December 31, 2012 (“2012 Form 10-K”), Part II, Item 1A of this report and in Part I, Item 2 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this report, these factors include, but are not limited to:

 

·                              our ability to manage capital expenditures and operations and maintenance costs while maintaining reliability and customer service levels;

·                              variations in demand for electricity, including those due to weather, the general economy, customer and sales growth (or decline), and the effects of energy conservation measures and distributed generation;

·                              power plant and transmission system performance and outages;

·                              volatile fuel and purchased power costs;

·                              fuel and water supply availability;

·                              our ability to achieve timely and adequate rate recovery of our costs, including returns on debt and equity capital;

·                              regulatory and judicial decisions, developments and proceedings;

·                              new legislation or regulation, including those relating to environmental requirements and nuclear plant operations;

·                              our ability to meet renewable energy and energy efficiency mandates and recover related costs;

·                              risks inherent in the operation of nuclear facilities, including spent fuel disposal uncertainty;

·                              competition in retail and wholesale power markets;

·                              the duration and severity of the economic decline in Arizona and current real estate market conditions;

·                             the cost of debt and equity capital and the ability to access capital markets when required;

·                              changes to our credit ratings;

·                              the investment performance of the assets of our nuclear decommissioning trust, pension, and other postretirement benefit plans and the resulting impact on future funding requirements;

·                              the liquidity of wholesale power markets and the use of derivative contracts in our business;

·                              potential shortfalls in insurance coverage;

·                              new accounting requirements or new interpretations of existing requirements;

·                              generation, transmission and distribution facility and system conditions and operating costs;

·                              the ability to meet the anticipated future need for additional baseload generation and associated transmission facilities in our region;

·                              the willingness or ability of our counterparties, power plant participants and power plant land owners to meet contractual or other obligations or extend the rights for continued power plant operations;

·                              technological developments affecting the electric industry; and

·                              restrictions on dividends or other provisions in our credit agreements and Arizona Corporation Commission (“ACC”) orders.

 

These and other factors are discussed in the Risk Factors described in Part I, Item 1A of our 2012 Form 10-K and in Part II, Item 1A of this report, which readers should review carefully before placing any reliance on our financial statements or disclosures.  Neither Pinnacle West nor APS assumes any obligation to update these statements, even if our internal estimates change, except as required by law.

 

2



Table of Contents

 

PART I — FINANCIAL INFORMATION

 

ITEM 1.  FINANCIAL STATEMENTS

 

PINNACLE WEST CAPITAL CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF INCOME

(unaudited)

(dollars and shares in thousands, except per share amounts)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

 

 

 

 

 

 

OPERATING REVENUES

 

$

686,652

 

$

620,631

 

 

 

 

 

 

 

OPERATING EXPENSES

 

 

 

 

 

Fuel and purchased power

 

230,679

 

216,309

 

Operations and maintenance

 

223,250

 

210,663

 

Depreciation and amortization

 

103,730

 

100,109

 

Taxes other than income taxes

 

40,021

 

42,475

 

Other expenses

 

2,049

 

3,068

 

Total

 

599,729

 

572,624

 

OPERATING INCOME

 

86,923

 

48,007

 

OTHER INCOME (DEDUCTIONS)

 

 

 

 

 

Allowance for equity funds used during construction

 

6,864

 

4,756

 

Other income (Note 10)

 

758

 

760

 

Other expense (Note 10)

 

(3,752

)

(4,068

)

Total

 

3,870

 

1,448

 

INTEREST EXPENSE

 

 

 

 

 

Interest charges

 

49,478

 

56,967

 

Allowance for borrowed funds used during construction

 

(3,990

)

(3,151

)

Total

 

45,488

 

53,816

 

INCOME (LOSS) FROM CONTINUING OPERATIONS BEFORE INCOME TAXES

 

45,305

 

(4,361

)

INCOME TAXES

 

12,469

 

(4,645

)

INCOME FROM CONTINUING OPERATIONS

 

32,836

 

284

 

LOSS FROM DISCONTINUED OPERATIONS

 

 

 

 

 

Net of income tax benefit of $(505)

 

 

(765

)

NET INCOME (LOSS)

 

32,836

 

(481

)

Less: Net income attributable to noncontrolling interests (Note 6)

 

8,392

 

7,776

 

NET INCOME (LOSS) ATTRIBUTABLE TO COMMON SHAREHOLDERS

 

$

24,444

 

$

(8,257

)

 

 

 

 

 

 

WEIGHTED-AVERAGE COMMON SHARES OUTSTANDING — BASIC

 

109,832

 

109,299

 

WEIGHTED-AVERAGE COMMON SHARES OUTSTANDING — DILUTED

 

110,835

 

109,299

 

 

 

 

 

 

 

EARNINGS PER WEIGHTED-AVERAGE COMMON SHARE OUTSTANDING

 

 

 

 

 

Income (loss) from continuing operations attributable to common shareholders — basic

 

$

0.22

 

$

(0.07

)

Net income (loss) attributable to common shareholders — basic

 

0.22

 

(0.08

)

Income (loss) from continuing operations attributable to common shareholders — diluted

 

0.22

 

(0.07

)

Net income (loss) attributable to common shareholders — diluted

 

0.22

 

(0.08

)

 

 

 

 

 

 

DIVIDENDS DECLARED PER SHARE

 

$

 

$

0.525

 

 

 

 

 

 

 

AMOUNTS ATTRIBUTABLE TO COMMON SHAREHOLDERS:

 

 

 

 

 

Income (loss) from continuing operations, net of tax

 

$

24,444

 

$

(7,483

)

Discontinued operations, net of tax

 

 

(774

)

Net income (loss) attributable to common shareholders

 

$

24,444

 

$

(8,257

)

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements.

 

3



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(unaudited)

(dollars in thousands)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

 

 

 

 

 

 

NET INCOME (LOSS)

 

$

32,836

 

$

(481

)

 

 

 

 

 

 

OTHER COMPREHENSIVE INCOME (LOSS), NET OF TAX

 

 

 

 

 

Derivative instruments:

 

 

 

 

 

Net unrealized gain (loss), net of tax benefit (expense) of ($38) and $16,551

 

58

 

(25,352

)

Reclassification of net realized loss, net of tax benefit of $3,300 and $5,728

 

5,053

 

8,772

 

Pension and other postretirement benefits activity, net of tax expense of $631 and $631

 

966

 

966

 

Total other comprehensive income (loss)

 

6,077

 

(15,614

)

 

 

 

 

 

 

COMPREHENSIVE INCOME (LOSS)

 

38,913

 

(16,095

)

Less: Comprehensive income attributable to noncontrolling interests

 

8,392

 

7,776

 

 

 

 

 

 

 

COMPREHENSIVE INCOME (LOSS) ATTRIBUTABLE TO COMMON SHAREHOLDERS

 

$

30,521

 

$

(23,871

)

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements.

 

4



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

CONDENSED CONSOLIDATED BALANCE SHEETS

(unaudited)

(dollars in thousands)

 

 

 

March 31,
2013

 

December 31,
2012

 

ASSETS

 

 

 

 

 

 

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

Cash and cash equivalents

 

$

25,109

 

$

26,202

 

Customer and other receivables

 

267,937

 

277,225

 

Accrued unbilled revenues

 

90,147

 

94,845

 

Allowance for doubtful accounts

 

(2,537

)

(3,340

)

Materials and supplies (at average cost)

 

223,605

 

218,096

 

Fossil fuel (at average cost)

 

35,211

 

31,334

 

Deferred income taxes

 

75,866

 

152,191

 

Income tax receivable (Note 5)

 

2,856

 

2,423

 

Assets from risk management activities (Note 7)

 

20,346

 

25,699

 

Deferred fuel and purchased power regulatory asset (Note 3)

 

41,315

 

72,692

 

Other regulatory assets (Note 3)

 

52,872

 

71,257

 

Other current assets

 

39,050

 

37,102

 

Total current assets

 

871,777

 

1,005,726

 

 

 

 

 

 

 

INVESTMENTS AND OTHER ASSETS

 

 

 

 

 

Assets from risk management activities (Note 7)

 

34,047

 

35,891

 

Nuclear decommissioning trust (Note 13)

 

596,168

 

570,625

 

Other assets

 

64,325

 

62,694

 

Total investments and other assets

 

694,540

 

669,210

 

 

 

 

 

 

 

PROPERTY, PLANT AND EQUIPMENT

 

 

 

 

 

Plant in service and held for future use

 

14,494,326

 

14,346,367

 

Accumulated depreciation and amortization

 

(4,997,126

)

(4,929,613

)

Net

 

9,497,200

 

9,416,754

 

Construction work in progress

 

498,124

 

565,716

 

Palo Verde sale leaseback, net of accumulated depreciation (Note 6)

 

128,027

 

128,995

 

Intangible assets, net of accumulated amortization

 

162,978

 

162,150

 

Nuclear fuel, net of accumulated amortization

 

140,909

 

122,778

 

Total property, plant and equipment

 

10,427,238

 

10,396,393

 

 

 

 

 

 

 

DEFERRED DEBITS

 

 

 

 

 

Regulatory assets (Note 3)

 

1,097,389

 

1,099,900

 

Income tax receivable (Note 5)

 

70,828

 

70,389

 

Other

 

139,155

 

137,997

 

Total deferred debits

 

1,307,372

 

1,308,286

 

 

 

 

 

 

 

TOTAL ASSETS

 

$

13,300,927

 

$

13,379,615

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements.

 

5



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

CONDENSED CONSOLIDATED BALANCE SHEETS

(unaudited)

(dollars in thousands)

 

 

 

March 31,
2013

 

December 31,
2012

 

LIABILITIES AND EQUITY

 

 

 

 

 

 

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

Accounts payable

 

$

212,078

 

$

221,312

 

Accrued taxes (Note 5)

 

164,554

 

124,939

 

Accrued interest

 

44,818

 

49,380

 

Common dividends payable

 

 

59,789

 

Short-term borrowings

 

 

92,175

 

Current maturities of long-term debt

 

122,828

 

122,828

 

Customer deposits

 

80,783

 

79,689

 

Liabilities from risk management activities (Note 7)

 

65,354

 

73,741

 

Regulatory liabilities (Note 3)

 

76,640

 

88,116

 

Other current liabilities

 

124,456

 

171,573

 

Total current liabilities

 

891,511

 

1,083,542

 

 

 

 

 

 

 

LONG-TERM DEBT LESS CURRENT MATURITIES

 

 

 

 

 

Long-term debt less current maturities

 

3,265,589

 

3,160,219

 

Palo Verde sale leaseback lessor notes less current maturities (Note 6)

 

38,869

 

38,869

 

Total long-term debt less current maturities

 

3,304,458

 

3,199,088

 

 

 

 

 

 

 

DEFERRED CREDITS AND OTHER

 

 

 

 

 

Deferred income taxes

 

2,064,476

 

2,151,371

 

Regulatory liabilities (Note 3)

 

805,230

 

759,201

 

Liability for asset retirements

 

358,184

 

357,097

 

Liabilities for pension and other postretirement benefits (Note 4)

 

1,034,327

 

1,058,755

 

Liabilities from risk management activities (Note 7)

 

82,876

 

85,264

 

Customer advances

 

108,986

 

109,359

 

Coal mine reclamation

 

119,044

 

118,860

 

Unrecognized tax benefits (Note 5)

 

72,252

 

71,135

 

Other

 

307,253

 

283,654

 

Total deferred credits and other

 

4,952,628

 

4,994,696

 

 

 

 

 

 

 

COMMITMENTS AND CONTINGENCIES (SEE NOTES)

 

 

 

 

 

 

 

 

 

 

 

EQUITY (Note 8)

 

 

 

 

 

Common stock, no par value

 

2,484,347

 

2,466,923

 

Treasury stock

 

(10,482

)

(4,211

)

Total common stock

 

2,473,865

 

2,462,712

 

Retained earnings

 

1,648,521

 

1,624,102

 

Accumulated other comprehensive loss:

 

 

 

 

 

Pension and other postretirement benefits

 

(63,450

)

(64,416

)

Derivative instruments

 

(44,481

)

(49,592

)

Total accumulated other comprehensive loss

 

(107,931

)

(114,008

)

Total shareholders’ equity

 

4,014,455

 

3,972,806

 

Noncontrolling interests (Note 6)

 

137,875

 

129,483

 

Total equity

 

4,152,330

 

4,102,289

 

 

 

 

 

 

 

TOTAL LIABILITIES AND EQUITY

 

$

13,300,927

 

$

13,379,615

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements.

 

6



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

(unaudited)

(dollars in thousands)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

CASH FLOWS FROM OPERATING ACTIVITIES

 

 

 

 

 

Net income (loss)

 

$

32,836

 

$

(481

)

Adjustments to reconcile net income (loss) to net cash provided by operating activities:

 

 

 

 

 

Depreciation and amortization including nuclear fuel

 

124,344

 

118,487

 

Deferred fuel and purchased power

 

31,194

 

46,754

 

Deferred fuel and purchased power amortization

 

1,122

 

(24,514

)

Allowance for equity funds used during construction

 

(6,864

)

(4,756

)

Deferred income taxes

 

12,163

 

(1,989

)

Change in derivative instruments fair value

 

333

 

1,985

 

Changes in current assets and liabilities:

 

 

 

 

 

Customer and other receivables

 

3,931

 

52,264

 

Accrued unbilled revenues

 

4,698

 

20,511

 

Materials, supplies and fossil fuel

 

(9,386

)

(13,753

)

Other current assets

 

(2,525

)

(3,502

)

Accounts payable

 

11,925

 

(39,355

)

Accrued taxes and income tax receivable — net

 

39,182

 

37,398

 

Other current liabilities

 

(62,636

)

(39,804

)

Change in margin and collateral accounts — assets

 

933

 

(1,853

)

Change in margin and collateral accounts — liabilities

 

24,205

 

(32,950

)

Change in other long-term assets

 

(31,202

)

(21,469

)

Change in other long-term liabilities

 

37,904

 

22,362

 

Net cash flow provided by operating activities

 

212,157

 

115,335

 

 

 

 

 

 

 

CASH FLOWS FROM INVESTING ACTIVITIES

 

 

 

 

 

Capital expenditures

 

(182,859

)

(240,973

)

Contributions in aid of construction

 

14,912

 

13,871

 

Allowance for borrowed funds used during construction

 

(3,990

)

(3,151

)

Proceeds from nuclear decommissioning trust sales

 

135,240

 

92,047

 

Investment in nuclear decommissioning trust

 

(139,553

)

(96,360

)

Other

 

(470

)

(533

)

Net cash flow used for investing activities

 

(176,720

)

(235,099

)

 

 

 

 

 

 

CASH FLOWS FROM FINANCING ACTIVITIES

 

 

 

 

 

Issuance of long-term debt

 

104,307

 

319,081

 

Repayment of long-term debt

 

 

(375,727

)

Short-term borrowings and payments — net

 

(92,175

)

216,600

 

Dividends paid on common stock

 

(58,067

)

(55,595

)

Common stock equity issuance

 

9,441

 

4,289

 

Other

 

(36

)

(1,757

)

Net cash flow provided by (used for) financing activities

 

(36,530

)

106,891

 

 

 

 

 

 

 

NET DECREASE IN CASH AND CASH EQUIVALENTS

 

(1,093

)

(12,873

)

 

 

 

 

 

 

CASH AND CASH EQUIVALENTS AT BEGINNING OF PERIOD

 

26,202

 

33,583

 

 

 

 

 

 

 

CASH AND CASH EQUIVALENTS AT END OF PERIOD

 

$

25,109

 

$

20,710

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements.

 

7



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

1.             Consolidation and Nature of Operations

 

The unaudited condensed consolidated financial statements include the accounts of Pinnacle West and our subsidiaries:  APS and El Dorado Investment Company (“El Dorado”) and formerly SunCor Development Company (“SunCor”).  Intercompany accounts and transactions between the consolidated companies have been eliminated.  The unaudited condensed consolidated financial statements for APS include the accounts of APS and the Palo Verde Nuclear Generating Station (“Palo Verde”) sale leaseback variable interest entities (“VIEs”) (see Note 6 for further discussion).  Our accounting records are maintained in accordance with accounting principles generally accepted in the United States of America (“GAAP”).  The preparation of financial statements in accordance with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of the financial statements and reported amounts of revenues and expenses during the reporting period.  Actual results could differ from those estimates.

 

Weather conditions cause significant seasonal fluctuations in our revenues; therefore, results for interim periods do not necessarily represent results expected for the year.

 

Our condensed consolidated financial statements reflect all adjustments (consisting only of normal recurring adjustments except as otherwise disclosed in the notes) that we believe are necessary for the fair presentation of our financial position, results of operations and cash flows for the periods presented.  These condensed consolidated financial statements and notes have been prepared consistently with the 2012 Form 10-K.

 

Supplemental Cash Flow Information

 

The following table summarizes supplemental Pinnacle West cash flow information (dollars in thousands):

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Cash paid during the period for:

 

 

 

 

 

Income taxes, net of (refunds)

 

$

425

 

$

(650

)

Interest, net of amounts capitalized

 

49,038

 

62,892

 

Significant non-cash investing and financing activities:

 

 

 

 

 

Accrued capital expenditures

 

$

6,575

 

$

13,622

 

 

2.             Long-Term Debt and Liquidity Matters

 

Pinnacle West and APS maintain committed revolving credit facilities in order to enhance liquidity and provide credit support for their commercial paper programs.

 

Pinnacle West

 

At March 31, 2013, Pinnacle West’s $200 million credit facility, which matures in November 2016, was available to refinance indebtedness of the Company and for other general corporate purposes, including credit support for its $200 million commercial paper program.  Pinnacle West has the option to increase the amount of the facility up to a maximum of $300 million upon the satisfaction of certain

 

8



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

conditions and with the consent of the lenders.  At March 31, 2013, Pinnacle West had no outstanding borrowings under its credit facility, no letters of credit outstanding, and no commercial paper borrowings.

 

APS

 

On March 22, 2013, APS issued an additional $100 million par amount of its outstanding 4.50% unsecured senior notes that mature on April 1, 2042.  The net proceeds from the sale were used to repay short-term commercial paper borrowings and replenish cash used to redeem certain tax-exempt indebtedness in November 2012.

 

At March 31, 2013, APS had two credit facilities totaling $1 billion, including a $500 million credit facility that was refinanced in April 2013 (see below) and a $500 million facility that matures in November 2016.  APS may increase the amount of each facility up to a maximum of $700 million upon the satisfaction of certain conditions and with the consent of the lenders.  APS will use these facilities to refinance indebtedness and for other general corporate purposes.  Interest rates are based on APS’s senior unsecured debt credit ratings.

 

On April 9, 2013, APS refinanced its $500 million revolving credit facility that would have matured in February 2015, with a new $500 million facility.  The new revolving credit facility terminates in April 2018.

 

The facilities described above are available to support APS’s $250 million commercial paper program, for bank borrowings or for issuances of letters of credit.  At March 31, 2013, APS had no outstanding borrowings or outstanding letters of credit under these credit facilities, nor did it have any commercial paper borrowings.

 

On May 1, 2013, APS purchased all $32 million of the Maricopa County, Arizona Pollution Control Corporation Pollution Control Revenue Refunding Bonds, 2009 Series C, due 2029.  We expect to remarket these bonds within the next twelve months.  These bonds are classified as current maturities of long-term debt on our Condensed Consolidated Balance Sheets at March 31, 2013 and December 31, 2012.

 

See “Financial Assurances” in Note 9 for a discussion of APS’s separate outstanding letters of credit.

 

Debt Fair Value

 

Our long-term debt fair value estimates are based on quoted market prices for the same or similar issues, and are classified within Level 2 of the fair value hierarchy.  See Note 12 for discussion of the fair value hierarchy.  The following table represents the estimated fair value of our long-term debt, including current maturities (dollars in millions):

 

9



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

As of
March 31, 2013

 

As of
December 31, 2012

 

 

 

Carrying
Amount

 

Fair Value

 

Carrying
Amount

 

Fair Value

 

 

 

 

 

 

 

 

 

 

 

Pinnacle West

 

$

125

 

$

125

 

$

125

 

$

125

 

APS

 

3,302

 

3,772

 

3,197

 

3,750

 

Total

 

$

3,427

 

$

3,897

 

$

3,322

 

$

3,875

 

 

Debt Provisions

 

An existing ACC order requires APS to maintain a common equity ratio of at least 40%.  As defined in the ACC order, the common equity ratio is total shareholder equity divided by the sum of total shareholder equity and long-term debt, including current maturities of long-term debt.  At March 31, 2013, APS was in compliance with this common equity ratio requirement.  Its total shareholder equity was approximately $4.1 billion, and total capitalization was approximately $7.4 billion.  APS would be prohibited from paying dividends if payment would reduce its total shareholder equity below approximately $2.9 billion, assuming APS’s total capitalization remains the same.  Since APS was in compliance with this common equity ratio requirement, this restriction does not materially affect Pinnacle West’s ability to meet its ongoing cash needs.

 

3.                                      Regulatory Matters

 

Retail Rate Case Filing with the Arizona Corporation Commission

 

On June 1, 2011, APS filed an application with the ACC for a net retail base rate increase of $95.5 million.  APS requested that the increase become effective July 1, 2012.  The request would have increased the average retail customer bill approximately 6.6%.  On January 6, 2012, APS and other parties to the general retail rate case entered into an agreement (the “Settlement Agreement”) detailing the terms upon which the parties agreed to settle the rate case.  On May 15, 2012, the ACC approved the Settlement Agreement without material modifications.

 

Settlement Agreement

 

The Settlement Agreement provides for a zero net change in base rates, consisting of:  (1) a non-fuel base rate increase of $116.3 million; (2) a fuel-related base rate decrease of $153.1 million (to be implemented by a change in the base fuel rate for fuel and purchased power costs (“Base Fuel Rate”) from $0.03757 to $0.03207 per kilowatt hour (“kWh”); and (3) the transfer of cost recovery for certain renewable energy projects from the Arizona Renewable Energy Standard and Tariff (“RES”) surcharge to base rates in an estimated amount of $36.8 million.

 

APS also agreed not to file its next general rate case before May 31, 2015, and not to request that its next general retail rate increase be effective prior to July 1, 2016.  The Settlement Agreement allows APS to request a change to its base rates during the stay-out period in the event of an extraordinary event that, in the ACC’s judgment, requires base rate relief in order to protect the public interest.  Nor is APS precluded from seeking rate relief, or any other party to the Settlement Agreement precluded from petitioning the ACC to examine the reasonableness of APS’s rates, in the event of significant regulatory

 

10



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

developments that materially impact the financial results expected under the terms of the Settlement Agreement.

 

Other key provisions of the Settlement Agreement include the following:

 

·                                          An authorized return on common equity of 10.0%;

 

·                                          A capital structure comprised of 46.1% debt and 53.9% common equity;

 

·                                          A test year ended December 31, 2010, adjusted to include plant that is in service as of March 31, 2012;

 

·                                          Deferral for future recovery or refund of property taxes above or below a specified 2010 test year level caused by changes to the Arizona property tax rate as follows:

 

·                                          Deferral of 25% in 2012, 50% in 2013 and 75% for 2014 and subsequent years if Arizona property tax rates increase; and

 

·                                          Deferral of 100% in all years if Arizona property tax rates decrease;

 

·                                          A procedure to allow APS to request rate adjustments prior to its next general rate case related to APS’s proposed acquisition (should it be consummated) of additional interests in Units 4 and 5 and the related closure of Units 1-3 of the Four Corners Power Plant (“Four Corners”);

 

·                                          Implementation of a “Lost Fixed Cost Recovery” rate mechanism to support energy efficiency and distributed renewable generation;

 

·                                          Modifications to the Environmental Improvement Surcharge (“EIS”) to allow for the recovery of carrying costs for capital expenditures associated with government-mandated environmental controls, subject to an existing cents per kWh cap on cost recovery that could produce up to approximately $5 million in revenues annually;

 

·                                          Modifications to the Power Supply Adjustor (“PSA”), including the elimination of the 90/10 sharing provision;

 

·                                          A limitation on the use of the RES surcharge and the Demand Side Management Adjustor Charge (“DSMAC”) to recoup capital expenditures not required under the terms of the 2008 rate case settlement agreement discussed below;

 

·                                          Allowing a negative credit that existed in the PSA rate to continue until February 2013, rather than being reset on the anticipated July 1, 2012 rate effective date;

 

·                                          Modification of the transmission cost adjustor (“TCA”) to streamline the process for future transmission-related rate changes; and

 

11



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

·                                          Implementation of various changes to rate schedules, including the adoption of an experimental “buy-through” rate that could allow certain large commercial and industrial customers to select alternative sources of generation to be supplied by APS.

 

The Settlement Agreement was approved by the ACC on May 15, 2012, with new rates effective on July 1, 2012.  This accomplished a goal set by the parties to the 2008 rate case settlement to process subsequent rate cases within twelve months of sufficiency findings from the ACC staff, which generally occur within 30 days after the filing of a rate case.

 

2008 General Retail Rate Case On-Going Impacts

 

On December 30, 2009, the ACC issued an order approving a settlement agreement entered into by APS and twenty-one other parties in APS’s prior general retail rate case, which was originally filed in March 2008.  The settlement agreement contains certain on-going requirements, commitments and authorizations that will survive the 2012 Settlement Agreement, including the following:

 

·                                          A commitment from APS to reduce average annual operational expenses by at least $30 million from 2010 through 2014;

 

·                                          Authorization and requirements of equity infusions into APS of at least $700 million during the period beginning June 1, 2009 through December 31, 2014 ($253 million of which was infused into APS from proceeds of a Pinnacle West equity issuance in the second quarter of 2010); and

 

·                                          Various modifications to the existing energy efficiency, demand side management and renewable energy programs that require APS to, among other things, expand its conservation and demand side management programs through 2012 and its use of renewable energy through 2015, as well as allow for concurrent recovery of renewable energy expenses and provide for more concurrent recovery of demand side management costs and incentives.

 

Cost Recovery Mechanisms

 

APS has received regulatory decisions that allow for more timely recovery of certain costs through the following recovery mechanisms.

 

Renewable Energy Standard.  In 2006, the ACC approved the RES.  Under the RES, electric utilities that are regulated by the ACC must supply an increasing percentage of their retail electric energy sales from eligible renewable resources, including solar, wind, biomass, biogas and geothermal technologies.  In order to achieve these requirements, the ACC allows APS to include a RES surcharge as part of customer bills to recover the approved amounts for use on renewable energy projects.  Each year APS is required to file a five-year implementation plan with the ACC and seek approval for funding the upcoming year’s RES budget.

 

On December 14, 2011, the ACC voted to approve APS’s 2012 RES plan covering the 2012-2016 timeframe and authorized a total 2012 RES budget of $110 million.  On June 29, 2012, APS filed its annual RES implementation plan, covering the 2013-2017 timeframe and requested 2013 RES funding of $97 million to $107 million.  In a final order dated January 31, 2013, the ACC approved a budget of $103 million for APS’s 2013 RES plan.  That budget includes $4 million for residential distributed energy

 

12



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

incentives and $0.1 million for commercial distributed energy up-front incentives, but did not include any funds for new commercial distributed energy production-based incentives beyond those for previously approved programs.  The ACC further ordered that a hearing take place to consider APS’s proposal to establish compliance with distributed energy requirements by tracking and recording distributed energy, rather than acquiring and retiring renewable energy credits.  The track and record approach would require monitoring the distributed energy systems that are connected to APS’s system, recording the amount of energy they produce, and reporting the energy production amounts to the ACC for informational purposes only.  Finally, the ACC authorized an APS-led multi-session technical conference designed to consider APS’s net metering policy and the cost and benefits of distributed energy.

 

Demand Side Management Adjustor Charge.  The ACC Electric Energy Efficiency Standards require APS to submit a Demand Side Management Implementation Plan for review by and approval of the ACC.  In 2010, the DSMAC was modified to recover estimated amounts for use on certain demand side management programs over the current year.  Previously, the DSMAC allowed for such recovery only on a historical or after-the-fact basis.  The surcharge allows for the recovery of energy efficiency program expenses and any earned incentives.

 

The ACC previously approved recovery of all 2009 program costs plus incentives.  The change from program cost recovery on a historical basis to recovery on a concurrent basis, as authorized in the 2008 retail rate case settlement agreement, resulted in this one-time need to address two years (2009 and 2010) of cost recovery.  As requested by APS, 2009 program cost recovery was amortized over a three-year period, which ended in 2012.

 

On June 1, 2011, APS filed its 2012 Demand Side Management Implementation Plan consistent with the ACC’s Electric Energy Efficiency Standards, which became effective January 1, 2011.  The 2012 requirement under such standards is for cumulative energy efficiency savings of 3% of APS retail sales for the prior year.  This energy savings requirement is slightly higher than the goal established by the 2008 retail rate case settlement agreement (2.75% of total energy resources for the same two-year period).  The ACC issued an order on April 4, 2012 approving recovery of approximately $72 million of APS’s energy efficiency and demand side management program costs.  This amount will be recovered by the then existing DSMAC over a twelve-month period beginning March 1, 2012.  This amount does not include $10 million already being recovered in general retail base rates.

 

On June 1, 2012, APS filed its 2013 Demand Side Management Implementation Plan.  In 2013, the standards will require APS to achieve cumulative energy savings equal to 5% of its 2012 retail energy sales.  Later in 2012, APS filed a supplement to its plan that included a proposed budget for 2013 of $87.6 million.  Although this proposed budget is approximately $5.6 million more than the approved 2012 budget, the expiration of the three-year amortization of 2009 costs and prior year credits would result in a small decrease in the DSMAC for the balance of 2013.  APS expects to receive a decision from the ACC in the second quarter of 2013.

 

PSA Mechanism and Balance.  The PSA provides for the adjustment of retail rates to reflect variations in retail fuel and purchased power costs.

 

The following table shows the changes in the deferred fuel and purchased power regulatory asset (liability) for 2013 and 2012 (dollars in millions):

 

13



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Beginning balance

 

$

73

 

$

28

 

Deferred fuel and purchased power costs — current period

 

(31

)

(47

)

Amounts (collected from) credited to customers

 

(1

)

24

 

Ending balance

 

$

41

 

$

5

 

 

The PSA rate for the PSA year beginning February 1, 2013 is $0.0013 per kWh as compared to ($0.0042) per kWh for the prior year.  This represents a $0.0055 per kWh increase over the 2012 PSA charge.  This new rate is comprised of a forward component of ($0.0010) per kWh and a historical component of $0.0023 per kWh.  The Settlement Agreement allowed APS to exceed the $0.004 per kWh cap to PSA rate changes in this instance.  Any uncollected (overcollected) deferrals during the 2013 PSA year will be included in the calculation of the PSA rate for the PSA year beginning February 1, 2014.

 

Transmission Rates and Transmission Cost Adjustor.  In July 2008, the United States Federal Energy Regulatory Commission (“FERC”) approved an Open Access Transmission Tariff for APS to move from fixed rates to a formula rate-setting methodology in order to more accurately reflect and recover the costs that APS incurs in providing transmission services.  A large portion of the rate represents charges for transmission services to serve APS’s retail customers (“Retail Transmission Charges”).  In order to recover the Retail Transmission Charges, APS was previously required to file an application with, and obtain approval from, the ACC to reflect changes in Retail Transmission Charges through the TCA.  Under the terms of the Settlement Agreement (discussed above), however, an adjustment to rates to recover the Retail Transmission Charges will be made annually each June 1 beginning in 2013 and will go into effect automatically unless suspended by the ACC.

 

The formula rate is updated each year effective June 1 on the basis of APS’s actual cost of service, as disclosed in APS’s FERC Form 1 report for the previous fiscal year.  Items to be updated include actual capital expenditures made as compared with previous projections, transmission revenue credits and other items.  The resolution of proposed adjustments can result in significant volatility in the revenues to be collected.  APS reviews the proposed formula rate filing amounts with the ACC staff.  Any items or adjustments which are not agreed to by APS and the ACC staff can remain in dispute until settled or litigated at FERC.  Settlement or litigated resolution of disputed issues could require an extended period of time and could have a significant effect on the Retail Transmission Charge because any adjustment, though applied prospectively, may be calculated to account for previously over- or under-collected amounts.

 

Effective June 1, 2012, APS’s annual wholesale transmission rates for all users of its transmission system increased by approximately $16 million for the twelve-month period beginning June 1, 2012 in accordance with the FERC-approved formula.  Because of higher relative system demand by APS’s retail customers, the approximately $16 million increase reflects roughly a $2 million decrease for wholesale customers and an $18 million increase for APS retail customers.

 

On July 18, 2012, the ACC authorized the implementation of the FERC-approved transmission rates for retail customers discussed above, which became effective August 2012.

 

14



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

As part of APS’s proposed acquisition of Southern California Edison’s (“SCE”) interest in Units 4 and 5 of Four Corners, APS and SCE agreed that upon closing of the acquisition (or in 2016 if the closing does not occur), the companies will terminate an existing agreement that provides transmission capacity for SCE to transmit its portion of the output from Four Corners to California.  On May 1, 2013, APS filed a request with FERC seeking authorization to cancel the existing agreement and defer a $40 million payment to be made by APS associated with the termination and recover the payment through amortization over a 10-year period.  APS believes the costs associated with the termination of the existing agreement are recoverable, but cannot predict whether FERC will approve our request; however, if the recovery is disallowed by FERC, APS would record a charge to its results of operations at the time of the disallowance.

 

Lost Fixed Cost Recovery (“LFCR”) Mechanism.  The LFCR mechanism permits APS to recover on an after-the-fact basis a portion of its fixed costs that would otherwise have been collected by APS in the kWh sales lost due to APS energy efficiency programs and to distributed generation such as roof-top solar arrays.  The fixed costs recoverable by the LFCR mechanism were established in the recent rate case and amount to approximately 3.1 cents per residential kWh lost and 2.3 cents per non-residential kWh lost.  The kWh’s lost from energy efficiency are based on a third-party evaluation of APS’s energy efficiency programs.  Distributed generation sales losses are determined from the metered output from the distributed generation units or if metering is unavailable, through accepted estimating techniques.

 

APS filed its first LFCR adjustment on January 15, 2013 and will file for its LFCR adjustment every January thereafter.  On February 12, 2013, the ACC approved an LFCR adjustment of $5.1 million, representing a pro-rated amount for 2012 since the Settlement Agreement went into effect on July 1, 2012.

 

15



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Regulatory Assets and Liabilities

 

The detail of regulatory assets is as follows (dollars in millions):

 

 

 

Remaining

 

 

 

 

 

 

 

 

 

 

 

Amortization

 

March 31, 2013

 

December 31, 2012

 

 

 

Period

 

Current

 

Non-Current

 

Current

 

Non-Current

 

Pension and other postretirement benefits

 

(a)

 

$

 

$

769

 

$

 

$

780

 

Income taxes — allowance for funds used during construction (“AFUDC”) equity

 

2043

 

4

 

93

 

4

 

92

 

Deferred fuel and purchased power — mark-to-market (Note 7)

 

2016

 

 

20

 

19

 

21

 

Transmission vegetation management

 

2016

 

9

 

20

 

9

 

23

 

Coal reclamation

 

2038

 

8

 

22

 

8

 

24

 

Palo Verde VIEs (Note 6)

 

2046

 

 

39

 

 

38

 

Deferred compensation

 

2036

 

 

35

 

 

34

 

Deferred fuel and purchased power (b) (c)

 

2013

 

41

 

 

73

 

 

Tax expense of Medicare subsidy

 

2024

 

2

 

17

 

2

 

17

 

Loss on reacquired debt

 

2034

 

1

 

18

 

2

 

18

 

Income taxes — investment tax credit basis adjustment

 

2042

 

1

 

31

 

1

 

26

 

Pension and other postretirement benefits deferral

 

2015

 

8

 

11

 

8

 

13

 

Other

 

Various

 

20

 

22

 

18

 

14

 

Total regulatory assets (d)

 

 

 

$

94

 

$

1,097

 

$

144

 

$

1,100

 

 


(a)                                 This asset represents the future recovery of under-funded pension and other postretirement benefit obligations through retail rates.  If these costs are disallowed by the ACC, this regulatory asset would be charged to other comprehensive income (“OCI”) and result in lower future revenues.

(b)                                 See “Cost Recovery Mechanisms” discussion above.

(c)                                  Subject to a carrying charge.

(d)                                 There are no regulatory assets for which the ACC has allowed recovery of costs but not allowed a return by exclusion from rate base.  FERC rates are set using a formula rate as described in “Transmission Rates and Transmission Cost Adjustor.”

 

16



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

The detail of regulatory liabilities is as follows (dollars in millions):

 

 

 

Remaining

 

 

 

 

 

 

 

 

 

 

 

Amortization

 

March 31, 2013

 

December 31, 2012

 

 

 

Period

 

Current

 

Non-Current

 

Current

 

Non-Current

 

Removal costs

 

(a)

 

$

28

 

$

320

 

$

27

 

$

321

 

Asset retirement obligations

 

(a)

 

 

273

 

 

256

 

Renewable energy standard (b)

 

2014

 

29

 

16

 

43

 

 

Income taxes — change in rates

 

2042

 

 

66

 

 

66

 

Spent nuclear fuel

 

2047

 

5

 

38

 

10

 

36

 

Deferred gains on utility property

 

2019

 

2

 

12

 

2

 

12

 

Income taxes — deferred investment tax credit

 

2042

 

2

 

63

 

2

 

52

 

Other

 

Various

 

11

 

17

 

4

 

16

 

Total regulatory liabilities

 

 

 

$

77

 

$

805

 

$

88

 

$

759

 

 


(a)                                 In accordance with regulatory accounting guidance, APS accrues for removal costs for its regulated assets, even if there is no legal obligation for removal.

(b)                                 See “Cost Recovery Mechanisms” discussion above.

 

4.                                      Retirement Plans and Other Benefits

 

Pinnacle West sponsors a qualified defined benefit and account balance pension plan, a non-qualified supplemental excess benefit retirement plan, and other postretirement benefit plans for the employees of Pinnacle West and our subsidiaries.  Pinnacle West uses a December 31 measurement date for its pension and other postretirement benefit plans.  The market-related value of our plan assets is their fair value at the measurement date.

 

Certain pension and other postretirement benefit costs in excess of amounts recovered in electric retail rates were deferred as a regulatory asset for future recovery, pursuant to an ACC regulatory order.  We deferred pension and other postretirement benefit costs of approximately $9 million for the three months ended March 31, 2012.  Pursuant to an ACC regulatory order, we began amortizing the regulatory asset in July 2012.  We amortized approximately $2 million for the three months ended March 31, 2013.  The following table provides details of the plans’ net periodic benefit costs and the portion of these costs charged to expense (including administrative costs and excluding amounts capitalized as overhead construction, billed to electric plant participants or charged or amortized to the regulatory asset) (dollars in millions):

 

17



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

Pension Benefits

 

Other Benefits

 

 

 

Three Months
Ended March 31,

 

Three Months
Ended March 31,

 

 

 

2013

 

2012

 

2013

 

2012

 

Service cost - benefits earned during the period

 

$

17

 

$

16

 

$

6

 

$

7

 

Interest cost on benefit obligation

 

29

 

30

 

10

 

12

 

Expected return on plan assets

 

(37

)

(35

)

(11

)

(11

)

Amortization of net actuarial loss

 

9

 

11

 

3

 

6

 

Net periodic benefit cost

 

$

18

 

$

22

 

$

8

 

$

14

 

Portion of cost charged to expense

 

$

10

 

$

6

 

$

5

 

$

3

 

 

Contributions

 

We have contributed $56 million to our pension plan year to date in 2013.  The minimum contributions for the pension plan due in 2013, 2014, and 2015 under the recently enacted Moving Ahead for Progress in the 21st Century Act (MAP-21) are estimated to be zero, $89 million, and $112 million, respectively.  We expect to make voluntary contributions totaling $140 million to the pension plan in 2013, and contributions up to approximately $175 million in each of 2014 and 2015.  The contributions to our other postretirement benefit plans for 2013, 2014 and 2015 are expected to be approximately $20 million each year.

 

5.                                      Income Taxes

 

The $71 million long-term income tax receivable on the Condensed Consolidated Balance Sheets represents the anticipated refunds related to an APS tax accounting method change approved by the Internal Revenue Service (“IRS”) in the third quarter of 2009.  This amount is classified as long-term, as there remains uncertainty regarding the timing of this cash receipt.  Further clarification of the timing is expected from the IRS within the next twelve months.

 

Net Income associated with the Palo Verde sale leaseback variable interest entities is not subject to tax (see Note 6).  As a result, there is no income tax expense associated with the VIEs recorded on the Condensed Consolidated Statements of Income.

 

It is reasonably possible that within the next twelve months the IRS will finalize the examination of tax returns for the years ended December 31, 2008 and 2009.  At this time, a reasonable estimate of the range of possible change in the uncertain tax position cannot be made.  However, we do not expect the ultimate outcome of this examination to have a material adverse impact on our financial position or results of operations.

 

The American Taxpayer Relief Act of 2012, signed into law on January 2, 2013, includes provisions making qualified property placed into service in 2013 eligible for 50% bonus depreciation for federal income tax purposes.  Full recognition of the cash benefit of this provision is expected to delay realization of approximately $78 million in federal general business income tax credit carryforwards which were classified as current deferred income taxes as of December 31, 2012.  These federal general business tax credit carryforwards have been reclassified to long-term deferred income taxes as of March 31, 2013 as they are no longer expected to be realized within the next twelve months.

 

18



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

As of March 31, 2013, the tax year ended December 31, 2008 and all subsequent tax years remain subject to examination by the IRS.  With few exceptions, we are no longer subject to state income tax examinations by tax authorities for years before 2008.

 

6.                                      Palo Verde Sale Leaseback Variable Interest Entities

 

In 1986, APS entered into agreements with three separate VIE lessor trusts in order to sell and lease back interests in Palo Verde Unit 2 and related common facilities.  APS will pay approximately $49 million per year for the years 2013 to 2015 related to these leases.  The lease agreements include fixed rate renewal periods, which gives APS the ability to utilize the asset for a significant portion of the asset’s economic life, and therefore provide APS with the power to direct activities of the VIEs that most significantly impact the VIEs’ economic performance.  Predominately due to the fixed rate renewal periods, APS has been deemed the primary beneficiary of these VIEs and therefore consolidates the VIEs.

 

On December 31, 2012, APS notified the lessor trust entities that APS would retain the assets beyond 2015 by either exercising the fixed rate lease renewals or by purchasing the assets.  If APS elects to purchase the assets, the purchase price will be based on the fair market value of the assets at the end of 2015.  If APS elects to extend the leases, we will be required to make payments beginning in 2016 of approximately $23 million annually.  The length of the lease extensions is unknown at this time as it must be determined through an appraisal process.  APS must give notice to the lessor trusts by June 30, 2014 notifying them which of these two options (lease renewal or purchasing the assets) it will exercise.  The December 31, 2012 notification does not impact APS’s consolidation of the VIEs, as APS continues to be deemed the primary beneficiary of the VIEs.

 

As a result of consolidation, we eliminate rent expense and recognize depreciation and interest expense, resulting in an increase in net income for the three months ended March 31, 2013 of $8 million and for the three months ended March 31, 2012 of $8 million, entirely attributable to the noncontrolling interests.  Income attributable to Pinnacle West shareholders remains the same.  Consolidation of these VIEs also results in changes to our Condensed Consolidated Statements of Cash Flows, but does not impact net cash flows.

 

Our Condensed Consolidated Balance Sheets at March 31, 2013 and December 31, 2012 include the following amounts relating to the VIEs (in millions):

 

 

 

March 31,
2013

 

December 31,
2012

 

Palo Verde sale leaseback property plant and equipment, net of accumulated depreciation

 

$

128

 

$

129

 

Current maturities of long-term debt

 

27

 

27

 

Palo Verde sale leaseback lessor notes long-term debt excluding current maturities

 

39

 

39

 

Equity — Noncontrolling interests

 

138

 

129

 

 

Assets of the VIEs are restricted and may only be used to settle the VIEs’ debt obligations and for payment to the noncontrolling interest holders.  Other than the VIEs’ assets reported on our consolidated financial statements, the creditors of the VIEs have no other recourse to the assets of APS or Pinnacle West, except in certain circumstances such as a default by APS under the lease.

 

19



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

APS is exposed to losses relating to these VIEs upon the occurrence of certain events that APS does not consider to be reasonably likely to occur.  Under certain circumstances (for example, the United States Nuclear Regulatory Commission (“NRC”) issuing specified violation orders with respect to Palo Verde or the occurrence of specified nuclear events), APS would be required to make specified payments to the VIEs’ noncontrolling equity participants, assume the VIEs’ debt, and take title to the leased Unit 2 interests, which, if appropriate, may be required to be written down in value.  If such an event had occurred as of March 31, 2013, APS would have been required to pay the noncontrolling equity participants approximately $139 million and assume $66 million of debt.  Since APS consolidates these VIEs, the debt APS would be required to assume is already reflected in our Condensed Consolidated Balance Sheets.

 

For regulatory ratemaking purposes, the leases continue to be treated as operating leases and, as a result, we have recorded a regulatory asset relating to the arrangements.

 

7.                                      Derivative Accounting

 

We are exposed to the impact of market fluctuations in the commodity price and transportation costs of electricity, natural gas, coal, emissions allowances and in interest rates.  We manage risks associated with market volatility by utilizing various physical and financial derivative instruments, including futures, forwards, options and swaps.  As part of our overall risk management program, we may use derivative instruments to hedge purchases and sales of electricity and fuels.  Derivative instruments that meet certain hedge accounting criteria may be designated as cash flow hedges and are used to limit our exposure to cash flow variability on forecasted transactions.  The changes in market value of such instruments have a high correlation to price changes in the hedged transactions.  We also enter into derivative instruments for economic hedging purposes.  While we believe the economic hedges mitigate exposure to fluctuations in commodity prices, these instruments have not been designated as accounting hedges.  Contracts that have the same terms (quantities, delivery points and delivery periods) and for which power does not flow are netted, which reduces both revenues and fuel and purchased power costs in our Condensed Consolidated Statements of Income, but does not impact our financial condition, net income or cash flows.

 

On June 1, 2012, we elected to discontinue cash flow hedge accounting treatment for the significant majority of our contracts that had previously been designated as accounting hedges.  This discontinuation is due to changes in PSA recovery (see Note 3), which now allows for 100% deferral of the unrealized gains and losses relating to these contracts.  For those contracts that were de-designated, all changes in fair value after May 31, 2012 are no longer recorded through other comprehensive income (“OCI”), but are deferred through the PSA.  The amounts previously recorded in accumulated OCI relating to these instruments will remain in accumulated OCI, and will transfer to earnings in the same period or periods during which the hedged transaction affects earnings or sooner if we determine it is probable that the forecasted transaction will not occur.  Cash flow hedge accounting treatment will continue for a limited number of contracts that are not subject to PSA recovery.

 

Our derivative instruments, excluding those qualifying for a scope exception, are recorded on the balance sheet as an asset or liability and are measured at fair value; see Note 12 for a discussion of fair value measurements.  Derivative instruments may qualify for the normal purchases and normal sales scope exception if they require physical delivery and the quantities represent those transacted in the normal course of business.  Derivative instruments qualifying for the normal purchases and normal sales

 

20



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

scope exception are accounted for under the accrual method of accounting and excluded from our derivative instrument discussion and disclosures below.

 

Hedge effectiveness is the degree to which the derivative instrument contract and the hedged item are correlated and is measured based on the relative changes in fair value of the derivative instrument contract and the hedged item over time.  We assess hedge effectiveness both at inception and on a continuing basis.  These assessments exclude the time value of certain options.  For accounting hedges that are deemed an effective hedge, the effective portion of the gain or loss on the derivative instrument is reported as a component of OCI and reclassified into earnings in the same period during which the hedged transaction affects earnings.  We recognize in current earnings, subject to the PSA, the gains and losses representing hedge ineffectiveness, and the gains and losses on any hedge components which are excluded from our effectiveness assessment.  As cash flow hedge accounting has been discontinued for the significant majority of our contracts, after May 31, 2012, effectiveness testing is no longer being performed for these contracts.

 

Prior to the Settlement Agreement, for its regulated operations, APS deferred for future rate treatment approximately 90% of unrealized gains and losses on certain derivatives pursuant to the PSA mechanism that would otherwise be recognized in income.  Due to the Settlement Agreement, for its regulated operations, APS now defers for future rate treatment 100% of the unrealized gains and losses for delivery periods after June 30, 2012 on derivatives pursuant to the PSA mechanism that would otherwise be recognized in income.  Realized gains and losses on derivatives are deferred in accordance with the PSA to the extent the amounts are above or below the Base Fuel Rate (see Note 3).  Gains and losses from derivatives in the following tables represent the amounts reflected in income before the effect of PSA deferrals.

 

As of March 31, 2013, we had the following outstanding gross notional volume of derivatives, which represent both purchases and sales (does not reflect net position):

 

Commodity

 

Quantity

 

Power

 

7,628

 

gigawatt hours

 

Gas

 

127

 

Bcfs (a)

 

 


(a)                                 “Bcf” is Billion Cubic Feet.

 

Gains and Losses from Derivative Instruments

 

The following table provides information about gains and losses from derivative instruments in designated cash flow accounting hedging relationships (dollars in thousands):

 

21



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

Financial Statement

 

Three Months Ended
March 31,

 

Commodity Contracts

 

Location

 

2013

 

2012

 

Gain (Loss) Recognized in OCI on Derivative Instruments (Effective Portion)

 

Other comprehensive income (loss) - derivative instruments

 

$

96

 

$

(41,903

)

Loss Reclassified from Accumulated Other Comprehensive Income into Income (Effective Portion Realized) (a)

 

Fuel and purchased power (b)

 

(8,353

)

(14,500

)

Gain Recognized in Income (Ineffective Portion and Amount Excluded from Effectiveness Testing)

 

Fuel and purchased power (b)

 

 

85

 

 


(a)         During the three months ended March 31, 2013 and 2012, we had no amounts reclassified from AOCI to earnings related to discontinued cash flow hedges.

(b)         Amounts are before the effect of PSA deferrals.

 

During the next twelve months, we estimate that a net loss of $40 million before income taxes will be reclassified from accumulated other comprehensive income as an offset to the effect of market price changes for the related hedged transactions.  In accordance with the PSA, substantially all of these amounts will be recorded as either a regulatory asset or liability and have no immediate effect on earnings.

 

The following table provides information about gains and losses from derivative instruments not designated as accounting hedging instruments during the three months ended March 31, 2013 and 2012 (dollars in thousands):

 

 

 

 

 

Three Months Ended
March 31,

 

Commodity Contracts

 

Financial Statement Location

 

2013

 

2012

 

 

 

 

 

 

 

 

 

Net Loss Recognized in Income

 

Operating revenues (a)

 

$

(117

)

$

(326

)

 

 

 

 

 

 

 

 

Net Gain (Loss) Recognized in Income

 

Fuel and purchased power expense (a)

 

17,350

 

(25,052

)

Total

 

 

 

$

17,233

 

$

(25,378

)

 


(a)         Amounts are before the effect of PSA deferrals.

 

Derivative Instruments in the Condensed Consolidated Balance Sheets

 

Our derivative transactions are typically executed under standardized or customized agreements, which include collateral requirements and in the event of a default would allow for the netting of positive and negative exposures associated with a single counterparty.  Agreements that allow for the offsetting of positive and negative exposures associated with a single counterparty are considered master netting arrangements.  Transactions with counterparties that have master netting arrangements are offset and

 

22



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

reported net on the Condensed Consolidated Balance Sheets.  Transactions that do not allow for offsetting of positive and negative positions are reported gross on the Condensed Consolidated Balance Sheets.

 

We do not offset a counterparty’s current derivative contracts with the counterparty’s non-current derivative contracts, although our master netting arrangements would allow current and non-current positions to be offset in the event of default.  Additionally, in the event of a default, our master netting arrangements would allow for the offsetting of all transactions executed under the master netting arrangement.  These types of transactions may include non-derivative instruments, derivatives qualifying for scope exceptions, trade receivables and trade payables arising from settled positions, and other forms of non-cash collateral (such as letters of credit).  These types of transactions are excluded from the offsetting tables presented below.

 

The significant majority of our derivative instruments are not currently designated as hedging instruments.  The Condensed Consolidated Balance Sheets as of March 31, 2013 and December 31, 2012, include gross liabilities of $5 million of derivative instruments designated as hedging instruments.

 

The following tables provide information about the fair value of our risk management activities reported on a gross basis, and the impacts of offsetting.  These amounts relate to commodity contracts and are located in the assets and liabilities from risk management activities lines of our Condensed Consolidated Balance Sheets.

 

As of March 31, 2013:
(dollars in thousands)

 

Gross
Recognized
Derivatives

(a)

 

Amounts
Offset

(b)

 

Net
Recognized
Derivatives

 

Other
(c)

 

Amount
Reported on
Balance Sheet

 

Current Assets

 

$

38,623

 

$

(18,344

)

$

20,279

 

$

67

 

$

20,346

 

Investments and Other Assets

 

39,467

 

(5,420

)

34,047

 

 

34,047

 

Total Assets

 

78,090

 

(23,764

)

54,326

 

67

 

54,393

 

 

 

 

 

 

 

 

 

 

 

 

 

Current Liabilities

 

(78,412

)

38,521

 

(39,891

)

(25,463

)

(65,354

)

Deferred Credits and Other

 

(93,215

)

10,339

 

(82,876

)

 

(82,876

)

Total Liabilities

 

(171,627

)

48,860

 

(122,767

)

(25,463

)

(148,230

)

Total

 

$

(93,537

)

$

25,096

 

$

(68,441

)

$

(25,396

)

$

(93,837

)

 


(a)         All of our gross recognized derivative instruments were subject to master netting arrangements.

(b)         Includes cash collateral provided to counterparties of $25,096.

(c)          Other represents cash collateral and margin relating to non-derivative instruments or derivatives qualifying for scope exceptions.  Includes cash collateral received from counterparties of $25,463, and cash margin provided to counterparties of $67.  This amount is not subject to offsetting.

 

23



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

As of December 31, 2012:
(dollars in thousands) 

 

Gross
Recognized
Derivatives
(a)

 

Amounts
Offset
(b)

 

Net
Recognized
Derivatives

 

Other
(c)

 

Amount
Reported on
Balance Sheet

 

Current Assets

 

$

42,495

 

$

(17,797

)

$

24,698

 

$

1,001

 

$

25,699

 

Investments and Other Assets

 

41,563

 

(5,672

)

35,891

 

 

35,891

 

Total Assets

 

84,058

 

(23,469

)

60,589

 

1,001

 

61,590

 

 

 

 

 

 

 

 

 

 

 

 

 

Current Liabilities

 

(105,324

)

57,046

 

(48,278

)

(25,463

)

(73,741

)

Deferred Credits and Other

 

(100,986

)

15,722

 

(85,264

)

 

(85,264

)

Total Liabilities

 

(206,310

)

72,768

 

(133,542

)

(25,463

)

(159,005

)

Total

 

$

(122,252

)

$

49,299

 

$

(72,953

)

$

(24,462

)

$

(97,415

)

 


(a)         All of our gross recognized derivative instruments were subject to master netting arrangements.

(b)         Includes cash collateral provided to counterparties of $49,299.

(c)          Other represents cash collateral relating to non-derivative instruments or derivatives qualifying for scope exceptions.  Includes cash collateral provided to counterparties of $1,001, and cash collateral received from counterparties of $25,463.  This amount is not subject to offsetting.

 

Credit Risk and Credit Related Contingent Features

 

We are exposed to losses in the event of nonperformance or nonpayment by counterparties.  We have risk management contracts with many counterparties, including two counterparties for which our exposure represents approximately 83% of Pinnacle West’s $54 million of risk management assets as of March 31, 2013.  This exposure relates to long-term traditional wholesale contracts with counterparties that have high credit quality.  Our risk management process assesses and monitors the financial exposure of all counterparties.  Despite the fact that the great majority of trading counterparties’ debt is rated as investment grade by the credit rating agencies, there is still a possibility that one or more of these companies could default, resulting in a material impact on consolidated earnings for a given period.  Counterparties in the portfolio consist principally of financial institutions, major energy companies, municipalities and local distribution companies.  We maintain credit policies that we believe minimize overall credit risk to within acceptable limits.  Determination of the credit quality of our counterparties is based upon a number of factors, including credit ratings and our evaluation of their financial condition.  To manage credit risk, we employ collateral requirements and standardized agreements that allow for the netting of positive and negative exposures associated with a single counterparty.  Valuation adjustments are established representing our estimated credit losses on our overall exposure to counterparties.

 

Certain of our derivative instrument contracts contain credit-risk-related contingent features including, among other things, investment grade credit rating provisions, credit-related cross default provisions, and adequate assurance provisions.  Adequate assurance provisions allow a counterparty with reasonable grounds for uncertainty to demand additional collateral based on a subjective event and/or condition.  For those derivative instruments in a net liability position, with investment grade credit contingencies, the counterparties could demand additional collateral if our debt credit rating were to fall below investment grade (below BBB- for Standard & Poor’s or Fitch or Baa3 for Moody’s).

 

24



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

The following table provides information about our derivative instruments that have credit-risk-related contingent features at March 31, 2013 (dollars in millions):

 

 

 

March 31,
2013

 

Aggregate Fair Value of Derivative Instruments in a Net Liability Position

 

$

172

 

Cash Collateral Posted

 

25

 

Additional Cash Collateral in the Event Credit-Risk Related Contingent Features were Fully Triggered (a)

 

106

 

 


(a)         This amount is after counterparty netting and includes those contracts which qualify for scope exceptions, which are excluded from the derivative details above.

 

We also have energy related non-derivative instrument contracts with investment grade credit-related contingent features which could also require us to post additional collateral of approximately $174 million if our debt credit ratings were to fall below investment grade.

 

8.                                      Changes in Equity

 

The following tables show Pinnacle West’s changes in shareholders’ equity and changes in equity of noncontrolling interests for the three months ended March 31, 2013 and 2012 (dollars in thousands):

 

 

 

Three Months Ended March 31, 2013

 

Three Months Ended March 31, 2012

 

 

 

Common
Shareholders

 

Noncontrolling
Interests

 

Total

 

Common
Shareholders

 

Noncontrolling
Interests

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Beginning balance, January 1

 

$

3,972,806

 

$

129,483

 

$

4,102,289

 

$

3,821,850

 

$

108,736

 

$

3,930,586

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net income (loss)

 

24,444

 

8,392

 

32,836

 

(8,257

)

7,776

 

(481

)

Other comprehensive income (loss)

 

6,077

 

 

6,077

 

(15,614

)

 

(15,614

)

Total comprehensive income (loss)

 

30,521

 

8,392

 

38,913

 

(23,871

)

7,776

 

(16,095

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Issuance of capital stock

 

2,574

 

 

2,574

 

2,700

 

 

2,700

 

Purchase of treasury stock — net

 

(6,271

)

 

(6,271

)

(1,754

)

 

(1,754

)

Other (primarily stock compensation)

 

14,825

 

 

14,825

 

3,350

 

 

3,350

 

Dividends on common stock

 

 

 

 

(57,358

)

 

(57,358

)

Ending balance, March 31

 

$

4,014,455

 

$

137,875

 

$

4,152,330

 

$

3,744,917

 

$

116,512

 

$

3,861,429

 

 

25



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

9.                                      Commitments and Contingencies

 

Palo Verde Nuclear Generating Station

 

Spent Nuclear Fuel and Waste Disposal

 

On December 19, 2012, APS, acting on behalf of itself and the participant owners of Palo Verde, filed a breach of contract lawsuit against the United States Department of Energy (“DOE”) in the United States Court of Federal Claims.  The lawsuit seeks to recover APS’s damages incurred due to DOE’s breach of the Standard Contract for failing to accept Palo Verde spent nuclear fuel and high level waste from January 1, 2007 through June 30, 2011, as it was required to do pursuant to the terms of the Standard Contract and the Nuclear Waste Policy Act.

 

APS currently estimates it will incur $122 million over the current life of Palo Verde for its share of the costs related to the on-site interim storage of spent nuclear fuel.  At March 31, 2013, APS had a regulatory liability of $43 million that represents amounts recovered in retail rates in excess of amounts spent for on-site interim spent fuel storage.

 

Nuclear Insurance

 

Public liability for incidents at nuclear power plants is governed by the Price-Anderson Nuclear Industries Indemnity Act (“Price-Anderson Act”), which limits the liability of nuclear reactor owners to the amount of insurance available from both private sources and an industry retrospective payment plan.  In accordance with the Price-Anderson Act, the Palo Verde participants are insured against public liability for a nuclear incident up to $12.6 billion per occurrence.  Palo Verde maintains the maximum available nuclear liability insurance in the amount of $375 million, which is provided by commercial insurance carriers.  The remaining balance of $12.2 billion of liability coverage is provided through a mandatory industry-wide retrospective assessment program.  If losses at any nuclear power plant covered by the program exceed the accumulated funds, APS could be assessed retrospective premium adjustments.  The maximum assessment per reactor under the program for each nuclear incident is approximately $118 million, subject to an annual limit of $18 million per incident, to be periodically adjusted for inflation.  Based on APS’s interest in the three Palo Verde units, APS’s maximum potential retrospective assessment per incident for all three units is approximately $103 million, with an annual payment limitation of approximately $15 million.

 

The Palo Verde participants maintain “all risk” (including nuclear hazards) insurance for property damage to, and decontamination of, property at Palo Verde in the aggregate amount of $2.75 billion, a substantial portion of which must first be applied to stabilization and decontamination.  Effective April 1, 2013, a sublimit of $1.5 billion for non-nuclear property damage losses has been imposed on the primary policy offered by Nuclear Electric Insurance Limited (“NEIL”).  APS has also secured insurance against portions of any increased cost of generation or purchased power and business interruption resulting from a sudden and unforeseen accidental outage of any of the three units.  Effective April 1, 2013, a sublimit of $327.6 million has been imposed on the non-nuclear losses of the accidental outage policy (NEIL I policy).  The property damage, decontamination, and replacement power coverages are provided by NEIL.  APS is subject to retrospective assessments under all NEIL policies if NEIL’s losses in any policy year exceed accumulated funds.  The maximum amount APS could incur under the current NEIL policies totals approximately $18 million for each retrospective assessment declared by NEIL’s Board of Directors due to losses.  In addition, NEIL policies contain rating triggers that would result in APS providing approximately $48 million of collateral assurance within 20 business days of a rating downgrade to non-

 

26



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

investment grade.  The insurance coverage discussed in this and the previous paragraph is subject to certain policy conditions, sublimits and exclusions.

 

Contractual Obligations

 

There have been no material changes outside the normal course of business in contractual obligations from the information provided in our 2012 Form 10-K.

 

Superfund-Related Matters

 

The Comprehensive Environmental Response, Compensation and Liability Act (“Superfund”) establishes liability for the cleanup of hazardous substances found contaminating the soil, water or air.  Those who generated, transported or disposed of hazardous substances at a contaminated site are among those who are potentially responsible parties (“PRPs”).  PRPs may be strictly, and often are jointly and severally, liable for clean-up.  On September 3, 2003, the United States Environmental Protection Agency (“EPA”) advised APS that EPA considers APS to be a PRP in the Motorola 52nd Street Superfund Site, Operable Unit 3 (“OU3”) in Phoenix, Arizona.  APS has facilities that are within this Superfund site.  APS and Pinnacle West have agreed with EPA to perform certain investigative activities of the APS facilities within OU3.  In addition, on September 23, 2009, APS agreed with EPA and one other PRP to voluntarily assist with the funding and management of the site-wide groundwater remedial investigation and feasibility study work plan.  We estimate that our costs related to this investigation and study will be approximately $2 million.  We anticipate incurring additional expenditures in the future, but because the overall investigation is not complete and ultimate remediation requirements are not yet finalized, at the present time expenditures related to this matter cannot be reasonably estimated.

 

The Roosevelt Irrigation District (“RID”) filed a lawsuit in Arizona District Court against over 40 defendants, alleging that RID’s groundwater wells were contaminated by the release of hazardous substances from facilities owned or operated by the defendants.  The lawsuit also alleges that, under Superfund laws, the defendants are jointly and severally liable to RID.  On February 21, 2013, certain of the defendants filed third-party complaints against additional parties, including APS.  The allegations against APS arise out of APS’s current and former ownership of facilities in and around OU3.  We are unable to determine a range of potential losses that are reasonably possible of occurring.

 

Climate Change Lawsuit

 

In February 2008, the Native Village of Kivalina and the City of Kivalina, Alaska filed a lawsuit in federal court in the Northern District of California against nine oil companies, fourteen power companies (including Pinnacle West), and a coal company, alleging that the defendants’ emissions of carbon dioxide contribute to global warming and constitute a public and private nuisance under both federal and state law.  The plaintiffs also allege that the effects of global warming will require the relocation of the village, and they are seeking an unspecified amount of monetary damages.  In June 2008, the defendants filed motions to dismiss the action, which were granted.  The plaintiffs filed an appeal with the United States Court of Appeals for the Ninth Circuit in November 2009.

 

On September 21, 2012, a three-judge panel of the Ninth Circuit affirmed the district court’s dismissal of the Kivalina plaintiffs’ federal common law public nuisance action.  The court declined to address any other issue raised by the parties, including the plaintiffs’ state nuisance law claim.  On

 

27



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

October 4, 2012, the plaintiffs filed a petition for rehearing by the entire Ninth Circuit, but on November 27, 2012, the court denied plaintiffs’ petition.  On February 25, 2013, plaintiffs requested the United States Supreme Court to hear the case.  The Court has not yet ruled on this request.  APS continues to believe the action in Kivalina is without merit and will continue to defend against both the federal and state claims.

 

Southwest Power Outage

 

On September 8, 2011 at approximately 3:30 PM, a 500 kilovolt (“kV”) transmission line running between the Hassayampa and North Gila substations in southwestern Arizona tripped out of service due to a fault that occurred at a switchyard operated by APS.  Approximately ten minutes after the transmission line went off-line, generation and transmission resources for the Yuma area were lost, resulting in approximately 69,700 APS customers losing service.

 

Within the same time period that APS’s Yuma customers lost service, a series of transmission and generation disruptions occurred across the systems of several utilities that resulted in outages affecting portions of southern Arizona, southern California and northern Mexico.  A total of approximately 7,900 megawatts (“MW”) of firm load and 2.7 million customers were reported to have been affected.  Service to all affected APS customers was restored by 9:15 PM on September 8.  Service to customers affected by the wider regional outages was restored by approximately 3:25 AM on September 9.

 

The FERC and the North American Electric Reliability Corporation (“NERC”) conducted a joint inquiry into the outages and, on May 1, 2012, they issued a report (the “Joint Report”) with their analysis and conclusions as to the causes of the events.  The report includes recommendations to help industry operators prevent similar outages in the future, including increased data sharing and coordination among the western utilities and entities responsible for bulk electric system reliability coordination.  The Joint Report does not address potential reliability violations or an assessment of responsibility of the parties involved.  APS continues to analyze business practices and procedures related to the September 8 events.

 

APS cannot predict the timing, results or potential impacts of enforcement actions that may be brought against APS relating to the September 8 events, or any claims that may be made as a result of the outages.  If violations of NERC Reliability Standards are ultimately determined to have occurred, FERC has the legal authority to assert a possible fine of up to $1 million per violation per day that a violation is found to have been in existence.

 

Clean Air Act Lawsuit

 

On October 4, 2011, Earthjustice, on behalf of several environmental organizations, filed a lawsuit in the United States District Court for the District of New Mexico against APS and the other Four Corners participants alleging violations of the New Source Review (“NSR”) provisions of the Clean Air Act.  Subsequent to filing its original Complaint, on January 6, 2012, Earthjustice filed a First Amended Complaint adding claims for violations of the Clean Air Act’s New Source Performance Standards (“NSPS”) program.  Among other things, the plaintiffs seek to have the court enjoin operations at Four Corners until APS applies for and obtains any required NSR permits and complies with the NSPS.  The plaintiffs further request the court to order the payment of civil penalties, including a beneficial mitigation project.  On April 2, 2012, APS and the other Four Corners participants filed motions to dismiss.  The case is being held in abeyance while the parties seek to negotiate a settlement.  On March 30, 2013, upon joint motion of the parties, the court issued an order deeming the motions to dismiss withdrawn without prejudice during pendency of the stay.  At such time as the stay is lifted, APS and the other Four Corners

 

28



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

participants may reinstate their motions to dismiss without risk of default.  We are unable to determine a range of potential losses that are reasonably possible of occurring.

 

Environmental Matters

 

APS is subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions, water quality, wastewater discharges, solid waste, hazardous waste, and coal combustion residuals (“CCR”).  These laws and regulations can change from time to time, imposing new obligations on APS resulting in increased capital, operating, and other costs.  Associated capital expenditures or operating costs could be material.  APS intends to seek recovery of any such environmental compliance costs through our rates, but cannot predict whether it will obtain such recovery.  The following proposed and final rules involve material compliance costs to APS.

 

Regional Haze Rules.  APS has received the final rulemaking imposing new requirements on Four Corners and the Cholla Power Plant (“Cholla”) and is currently awaiting a final rulemaking from EPA that could impose new requirements on the Navajo Generating Station (“Navajo Plant”).  EPA and Arizona Department of Environmental Quality (“ADEQ”) will require these plants to install pollution control equipment that constitutes the best available retrofit technology to lessen the impacts of emissions on visibility surrounding the plants.  Based on EPA’s final standards, APS’s share of its total costs for Four Corners (assuming the consummation of its purchase of SCE’s interest in Units 4 and 5 and subsequent shut down of Units 1-3) could be approximately $300 million.  APS’s share of costs for upgrades at Navajo, based on EPA’s Federal Implementation Plan (“FIP”) proposal, could be up to approximately $158 million.  APS has filed a Petition for Review of EPA’s rule as it applies to Cholla, which, if not successful, will require installation of controls with a cost to APS of approximately $187 million.

 

Mercury and Other Hazardous Air Pollutants.  In 2011, EPA issued rules establishing maximum achievable control technology standards to regulate emissions of mercury and other hazardous air pollutants from fossil-fired plants.  APS estimates that the cost for the remaining equipment necessary to meet these standards is approximately $124 million for Cholla Units 1-3.  Estimated costs for Four Corners Units 1-3 are not included in our current environmental expenditure estimates since our estimates assume the consummation of APS’s purchase of SCE’s interest in Four Corners Units 4 and 5 and the subsequent shut down of Units 1-3.  Salt River Project Agricultural Improvement and Power District (“SRP”), the operating agent for the Navajo Plant, is still evaluating compliance options under the rules.

 

Other future environmental rules that could involve material compliance costs include those related to cooling water intake structures, coal combustion waste, effluent limitations, ozone national ambient air quality, greenhouse gas emissions and other rules or matters involving the Clean Air Act, Endangered Species Act, the Navajo Nation, and water supplies for our power plants.  The financial impact of complying with these and other future environmental rules could jeopardize the economic viability of our coal plants or the willingness or ability of power plant participants to fund any required equipment upgrades or continue their participation in these plants.  The economics of continuing to own certain resources, particularly our coal plants, may deteriorate, warranting early retirement of those plants, which may result in asset impairments.  APS would seek recovery in rates for the book value of any remaining investments in the plants as well as other costs related to early retirement, but cannot predict whether it would obtain such recovery.

 

29



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Regional Haze Rules — Cholla

 

APS believes that EPA’s final rule as it applies to Cholla is unsupported and that EPA had no basis for disapproving Arizona’s State Implementation Plan (“SIP”) and promulgating a FIP that is inconsistent with the state’s considered “best available retrofit technology” (“BART”) determinations under the regional haze program.  Accordingly, on February 1, 2013, APS filed a Petition for Review of the final BART rule in the United States Court of Appeals for the Ninth Circuit.  In addition, on February 4, 2013, APS filed a Petition for Reconsideration and Stay of the final BART rule with EPA.  On March 22, 2013, APS filed a motion with the court to suspend the compliance deadlines under the BART rule until the court rules on the matter.  The State of Arizona and three other utilities also filed similar petitions and motions.

 

Financial Assurances

 

APS has entered into various agreements that require letters of credit for financial assurance purposes.  At March 31, 2013, approximately $76 million of letters of credit were outstanding to support existing pollution control bonds of a similar amount.  The letters of credit are available to fund the payment of principal and interest of such debt obligations.  One of these letters of credit expires in 2015 and two expire in 2016.  APS has also entered into letters of credit to support certain equity participants in the Palo Verde sale leaseback transactions (see Note 6 for further details on the Palo Verde sale leaseback transactions).  These letters of credit will expire December 31, 2015, and totaled approximately $34 million at March 31, 2013.  Additionally, APS has issued letters of credit to support collateral obligations under certain risk management arrangements including certain natural gas tolling contracts entered into with third parties.  At March 31, 2013, $65 million of such letters of credit were outstanding that will expire in 2013 and 2015.

 

We enter into agreements that include indemnification provisions relating to liabilities arising from or related to certain of our agreements; most significantly, APS has agreed to indemnify the equity participants and other parties in the Palo Verde sale leaseback transactions with respect to certain tax matters.  Generally, a maximum obligation is not explicitly stated in the indemnification provisions and, therefore, the overall maximum amount of the obligation under such indemnification provisions cannot be reasonably estimated.  Based on historical experience and evaluation of the specific indemnities, we do not believe that any material loss related to such indemnification provisions is likely.

 

Pinnacle West has issued parental guarantees and surety bonds for APS which were not material at March 31, 2013.

 

10.                               Other Income and Other Expense

 

The following table provides detail of other income and other expense for the three months ended March 31, 2013 and 2012 (dollars in thousands):

 

30



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Other income:

 

 

 

 

 

Interest income

 

$

76

 

$

605

 

Miscellaneous

 

682

 

155

 

Total other income

 

$

758

 

$

760

 

 

 

 

 

 

 

Other expense:

 

 

 

 

 

Non-operating costs

 

$

(1,932

)

$

(1,850

)

Investment losses — net

 

(112

)

(53

)

Miscellaneous

 

(1,708

)

(2,165

)

Total other expense

 

$

(3,752

)

$

(4,068

)

 

11.          Earnings Per Share

 

The following table presents earnings per weighted average common share outstanding for the three months ended March 31, 2013 and 2012:

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Basic earnings per share:

 

 

 

 

 

Income (loss) from continuing operations attributable to common shareholders

 

$

0.22

 

$

(0.07

)

Loss from discontinued operations

 

 

(0.01

)

Earnings (loss) per share — basic

 

$

0.22

 

$

(0.08

)

 

 

 

 

 

 

Diluted earnings per share:

 

 

 

 

 

Income (loss) from continuing operations attributable to common shareholders

 

$

0.22

 

$

(0.07

)

Loss from discontinued operations

 

 

(0.01

)

Earnings (loss) per share — diluted

 

$

0.22

 

$

(0.08

)

 

Performance shares and restricted stock units (which are contingently issuable) increased the weighted average common shares outstanding by approximately 1,003,000 shares for the three months ended March 31, 2013.  For the three months ended March 31, 2012, the weighted average common shares outstanding were the same for both basic and diluted shares.

 

For the three months ended March 31, 2013 and 2012, there were no common stock options that were excluded from the computation of diluted earnings per share as a result of the options’ exercise prices being greater than the average market price of the common shares.

 

31



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

12.          Fair Value Measurements

 

We classify our assets and liabilities that are carried at fair value within the fair value hierarchy.  This hierarchy ranks the quality and reliability of the inputs used to determine fair values, which are then classified and disclosed in one of three categories.  The three levels of the fair value hierarchy are:

 

Level 1 — Unadjusted quoted prices in active markets for identical assets or liabilities that we have the ability to access at the measurement date.  Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide information on an ongoing basis.  This category includes exchange-traded equities, exchange-traded derivative instruments, cash equivalents, and investments in United States Treasury securities.

 

Level 2 — Utilizes quoted prices in active markets for similar assets or liabilities; quoted prices in markets that are not active; and model-derived valuations whose inputs are observable (such as yield curves).  This category includes non-exchange traded contracts such as forwards, options, swaps and certain investments in fixed income securities.  This category also includes investments in common and collective trusts and commingled funds that are redeemable and valued based on the funds’ net asset value (“NAV”).

 

Level 3 — Valuation models with significant unobservable inputs that are supported by little or no market activity.  Instruments in this category include long-dated derivative transactions where valuations are unobservable due to the length of the transaction, options, and transactions in locations where observable market data does not exist.  The valuation models we employ utilize spot prices, forward prices, historical market data and other factors to forecast future prices.

 

Assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement.  Thus, a valuation may be classified in Level 3 even though the valuation may include significant inputs that are readily observable.  We maximize the use of observable inputs and minimize the use of unobservable inputs.  We rely primarily on the market approach of using prices and other market information for identical and/or comparable assets and liabilities.  If market data is not readily available, inputs may reflect our own assumptions about the inputs market participants would use.  Our assessment of the inputs and the significance of a particular input to the fair value measurement requires judgment and may affect the valuation of fair value assets and liabilities as well as their placement within the fair value hierarchy levels.  We assess whether a market is active by obtaining observable broker quotes, reviewing actual market activity, and assessing the volume of transactions.  We consider broker quotes observable inputs when the quote is binding on the broker, we can validate the quote with market activity, or we can determine that the inputs the broker used to arrive at the quoted price are observable.

 

Recurring Fair Value Measurements

 

We apply recurring fair value measurements to certain cash equivalents, derivative instruments, investments held in our nuclear decommissioning trust and plan assets held in our retirement and other benefit plans.  See Note 8 in the 2012 Form 10-K for the fair value discussion of plan assets held in our retirement and other benefit plans.

 

32



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Cash Equivalents

 

Cash equivalents represent short-term investments with original maturities of three months or less in exchange traded money market funds that are valued using quoted prices in active markets.

 

Risk Management Activities — Derivative Instruments

 

Exchange traded commodity contracts are valued using unadjusted quoted prices.  For non-exchange traded commodity contracts, we calculate fair market value based on the average of the bid and offer price, discounted to reflect net present value.  We maintain certain valuation adjustments for a number of risks associated with the valuation of future commitments.  These include valuation adjustments for liquidity and credit risks.  The liquidity valuation adjustment represents the cost that would be incurred if all unmatched positions were closed out or hedged.  The credit valuation adjustment represents estimated credit losses on our net exposure to counterparties, taking into account netting agreements, expected default experience for the credit rating of the counterparties and the overall diversification of the portfolio.  We maintain credit policies that management believes minimize overall credit risk.

 

Certain non-exchange traded commodity contracts are valued based on unobservable inputs due to the long-term nature of contracts or the unique location of the transactions.  Our long-dated energy transactions consist of observable valuations for the near-term portion and unobservable valuations for the long-term portions of the transaction.  We rely primarily on broker quotes to value these instruments.  When our valuations utilize broker quotes, we perform various control procedures to ensure the quote has been developed consistent with fair value accounting guidance.  These controls include assessing the quote for reasonableness by comparison against other broker quotes, reviewing historical price relationships, and assessing market activity.  When broker quotes are not available, the primary valuation technique used to calculate fair value is the extrapolation of forward pricing curves using observable market data for more liquid delivery points in the same region and actual transactions at more illiquid delivery points.

 

Option contracts are primarily valued using a Black-Scholes option valuation model which utilizes both observable and unobservable inputs such as broker quotes, interest rates and price volatilities.

 

When the unobservable portion is significant to the overall valuation of the transaction, the entire transaction is classified as Level 3.  Our classification of instruments as Level 3 is primarily reflective of the long-term nature of our energy transactions and the use of option valuation models with significant unobservable inputs.

 

Our energy risk management committee, consisting of officers and key management personnel, oversees our energy risk management activities to ensure compliance with our stated energy risk management policies.  We have a risk control function that is responsible for valuing our derivative commodity instruments in accordance with established policies and procedures.  The risk control function reports to the chief financial officer’s organization.

 

33



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Investments Held in our Nuclear Decommissioning Trust

 

The nuclear decommissioning trust invests in fixed income securities and equity securities.  Equity securities are held indirectly through commingled funds.  The commingled funds are valued based on the concept of NAV, which is a value primarily derived from the quoted active market prices of the underlying equity securities.  We may transact in these commingled funds on a semi-monthly basis at the NAV, and accordingly classify these investments as Level 2.  The commingled funds, which are similar to mutual funds, are maintained by a bank and hold investments in accordance with the stated objective of tracking the performance of the S&P 500 index.  Because the commingled fund shares are offered to a limited group of investors, they are not considered to be traded in an active market.

 

Cash equivalents reported within Level 2 represent investments held in a short-term investment commingled fund, valued using NAV, which invests in United States government fixed income securities.  We may transact in this commingled fund on a daily basis at the NAV.

 

Fixed income securities issued by the United States Treasury held directly by the nuclear decommissioning trust are valued using quoted active market prices and are classified as Level 1.  Fixed income securities issued by corporations, municipalities, and other agencies including mortgage-backed instruments are valued using quoted inactive market prices, quoted active market prices for similar securities, or by utilizing calculations which incorporate observable inputs such as yield curves and spreads relative to such yield curves.  These instruments are classified as Level 2.  Whenever possible, multiple market quotes are obtained which enables a cross-check validation.  A primary price source is identified based on asset type, class, or issue of securities.

 

Our trustee provides valuation of our nuclear decommissioning trust assets by using pricing services that utilize the valuation methodologies described to determine fair market value.  We have internal control procedures designed to ensure this information is consistent with fair value accounting guidance.  These procedures include assessing valuations using an independent pricing source, verifying that pricing can be supported by actual recent market transactions, assessing hierarchy classifications, comparing investment returns with benchmarks, and obtaining and reviewing independent audit reports on the trustee’s internal operating controls and valuation processes.  See Note 13 for additional discussion about our nuclear decommissioning trust.

 

34



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Fair Value Tables

 

The following table presents the fair value at March 31, 2013 of our assets and liabilities that are measured at fair value on a recurring basis (dollars in millions):

 

 

 

Quoted Prices
in Active
Markets for
Identical
Assets
(Level 1)

 

Significant
Other
Observable
Inputs
(Level 2)

 

Significant
Unobservable
Inputs (a)
(Level 3)

 

Other

 

Balance at
March 31,
2013

 

Assets

 

 

 

 

 

 

 

 

 

 

 

Risk management activities — derivative instruments:

 

 

 

 

 

 

 

 

 

 

 

Commodity contracts

 

$

 

$

28

 

$

50

 

$

(24

)(b)

$

54

 

Nuclear decommissioning trust:

 

 

 

 

 

 

 

 

 

 

 

U.S. commingled equity funds

 

 

226

 

 

 

226

 

Fixed income securities:

 

 

 

 

 

 

 

 

 

 

 

U.S. Treasury

 

115

 

 

 

 

115

 

Cash and cash equivalent funds

 

5

 

17

 

 

(9

)(c)

13

 

Corporate debt

 

 

80

 

 

 

80

 

Mortgage-backed securities

 

 

89

 

 

 

89

 

Municipality bonds

 

 

63

 

 

 

63

 

Other

 

 

10

 

 

 

10

 

Subtotal nuclear decommissioning trust

 

120

 

485

 

 

(9

)

596

 

Total

 

$

120

 

$

513

 

$

50

 

$

(33

)

$

650

 

 

 

 

 

 

 

 

 

 

 

 

 

Liabilities

 

 

 

 

 

 

 

 

 

 

 

Risk management activities — derivative instruments:

 

 

 

 

 

 

 

 

 

 

 

Commodity contracts

 

$

 

$

(69

)

$

(103

)

$

24

(b)

$

(148

)

 


(a)                                 Primarily consists of heat rate options and long-dated electricity contracts.

(b)                                 Primarily represents counterparty netting, margin and collateral (see Note 7).

(c)                                  Represents nuclear decommissioning trust net pending securities sales and purchases.

 

35



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

The following table presents the fair value at December 31, 2012 of our assets and liabilities that are measured at fair value on a recurring basis (dollars in millions):

 

 

 

Quoted Prices
in Active
Markets for
Identical
Assets
(Level 1)

 

Significant
Other
Observable
Inputs
(Level 2)

 

Significant
Unobservable
Inputs (a)
(Level 3)

 

Other

 

Balance at
December 31,
2012

 

Assets

 

 

 

 

 

 

 

 

 

 

 

Cash equivalents

 

$

16

 

$

 

$

 

$

 

$

16

 

Risk management activities — derivative instruments:

 

 

 

 

 

 

 

 

 

 

 

Commodity Contracts

 

 

22

 

62

 

(22

)(b)

62

 

Nuclear decommissioning trust:

 

 

 

 

 

 

 

 

 

 

 

U.S. commingled equity funds

 

 

204

 

 

 

204

 

Fixed income securities:

 

 

 

 

 

 

 

 

 

 

 

U.S. Treasury

 

104

 

 

 

 

104

 

Cash and cash equivalent funds

 

6

 

13

 

 

(4

)(c)

15

 

Corporate debt

 

 

80

 

 

 

80

 

Mortgage-backed securities

 

 

83

 

 

 

83

 

Municipality bonds

 

 

74

 

 

 

74

 

Other

 

 

11

 

 

 

11

 

Subtotal nuclear decommissioning trust

 

110

 

465

 

 

(4

)

571

 

Total

 

$

126

 

$

487

 

$

62

 

$

(26

)

$

649

 

 

 

 

 

 

 

 

 

 

 

 

 

Liabilities

 

 

 

 

 

 

 

 

 

 

 

Risk management activities — derivative instruments:

 

 

 

 

 

 

 

 

 

 

 

Commodity contracts

 

$

 

$

(96

)

$

(110

)

$

47

(b)

$

(159

)

 


(a)                                 Primarily consists of heat rate options and long-dated electricity contracts.

(b)                                 Represents counterparty netting, margin and collateral (see Note 7).

(c)                                  Represents nuclear decommissioning trust net pending securities sales and purchases.

 

Fair Value Measurements Classified as Level 3

 

The significant unobservable inputs used in the fair value measurement of our energy derivative contracts include broker quotes that cannot be validated as an observable input primarily due to the long term nature of the quote and option model inputs.  Significant changes in these inputs in isolation would result in significantly higher or lower fair value measurements.  Changes in our derivative contract fair values, including changes relating to unobservable inputs, typically will not impact net income due to regulatory accounting treatment (see Note 3).

 

36



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

Because our forward commodity contracts classified as Level 3 are currently in a net purchase position, we would expect price increases of the underlying commodity to result in increases in the net fair value of the related contracts.  Conversely, if the price of the underlying commodity decreases, the net fair value of the related contracts would likely decrease.

 

Our option contracts classified as Level 3 primarily relate to purchase heat rate options.  The significant unobservable inputs for these instruments include electricity prices, gas prices and implied volatilities.  If electricity prices and electricity price implied volatilities increase, we would expect the fair value of these options to increase, and if these valuation inputs decrease, we would expect the fair value of these options to decrease.  If natural gas prices and natural gas price implied volatilities increase, we would expect the fair value of these options to decrease, and if these inputs decrease, we would expect the fair value of the options to increase.  The commodity prices and implied volatilities do not always move in corresponding directions.  The options’ fair values are impacted by the net changes of these various inputs.

 

Other unobservable valuation inputs include credit and liquidity reserves which do not have a material impact on our valuations; however, significant changes in these inputs could also result in higher or lower fair value measurements.

 

The following table provides information regarding our significant unobservable inputs used to value our Level 3 instruments:

 

 

 

March 31, 2013
Fair Value (millions)

 

Valuation

 

Significant

 

 

 

Weighted-

 

Commodity Contracts

 

Assets

 

Liabilities

 

Technique

 

Unobservable Input

 

Range

 

Average

 

Electricity:

 

 

 

 

 

 

 

 

 

 

 

 

 

Forward Contracts (a)

 

$

49

 

$

73

 

Discounted cash flows

 

Electricity forward price (per MWh)

 

$24.88 - $65.92

 

$

44.47

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Option Contracts

 

 

29

 

Option model

 

Electricity forward price (per MWh)

 

$42.37 - $90.46

 

$

61.70

 

 

 

 

 

 

 

 

 

Natural gas forward price (per mmbtu)

 

$4.09 - $4.22

 

$

4.17

 

 

 

 

 

 

 

 

 

Implied electricity price volatilities

 

15% - 74%

 

40

%

 

 

 

 

 

 

 

 

Implied natural gas price volatilities

 

16% - 31%

 

22

%

Natural Gas:

 

 

 

 

 

 

 

 

 

 

 

 

 

Forward Contracts (a)

 

1

 

1

 

Discounted cash flows

 

Natural gas forward price (per mmbtu)

 

$3.81 - $4.48

 

$

4.29

 

Total

 

$

50

 

$

103

 

 

 

 

 

 

 

 

 

 


(a)                                 Includes swaps and physical and financial contracts.

 

37



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

 

 

December 31, 2012
Fair Value (millions)

 

Valuation

 

Significant

 

 

 

Weighted-

 

Commodity Contracts

 

Assets

 

Liabilities

 

Technique

 

Unobservable Input

 

Range

 

Average

 

Electricity:

 

 

 

 

 

 

 

 

 

 

 

 

 

Forward Contracts (a)

 

$

57

 

$

82

 

Discounted cash flows

 

Electricity forward price (per MWh)

 

$23.06 - $64.20

 

$

43.16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Option Contracts

 

 

27

 

Option model

 

Electricity forward price (per MWh)

 

$36.66 - $92.19

 

$

60.97

 

 

 

 

 

 

 

 

 

Natural gas forward price (per mmbtu)

 

$4.10 - $4.25

 

$

4.20

 

 

 

 

 

 

 

 

 

Implied electricity price volatilities

 

15% - 66%

 

39

%

 

 

 

 

 

 

 

 

Implied natural gas price volatilities

 

17% - 36%

 

23

%

Natural Gas:

 

 

 

 

 

 

 

 

 

 

 

 

 

Forward Contracts (a)

 

5

 

1

 

Discounted cash flows

 

Natural gas forward price (per mmbtu)

 

$3.25 - $4.44

 

$

3.93

 

Total

 

$

62

 

$

110

 

 

 

 

 

 

 

 

 

 


(a)                                 Includes swaps and physical and financial contracts.

 

The following table shows the changes in fair value for our risk management activities assets and liabilities that are measured at fair value on a recurring basis using Level 3 inputs for the three months ended March 31, 2013 and 2012 (dollars in millions):

 

 

 

Three Months Ended
March 31,

 

Commodity Contracts

 

2013

 

2012

 

Net derivative balance at beginning of period

 

$

(48

)

$

(51

)

Total net gains (losses) realized/unrealized:

 

 

 

 

 

Included in earnings

 

 

1

 

Included in OCI

 

 

(5

)

Deferred as a regulatory asset or liability

 

(1

)

(5

)

Settlements

 

(2

)

1

 

Transfers into Level 3 from Level 2

 

(1

)

2

 

Transfers from Level 3 into Level 2

 

(1

)

(1

)

Net derivative balance at end of period

 

$

(53

)

$

(58

)

 

 

 

 

 

 

Net unrealized gains included in earnings related to instruments still held at end of period

 

$

 

$

 

 

Amounts included in earnings are recorded in either operating revenues or purchased power depending on the nature of the underlying contract.

 

Transfers reflect the fair market value at the beginning of the period and are triggered by a change in the lowest significant input as of the end of the period.  We had no significant Level 1 transfers to or

 

38



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

from any other hierarchy level.  Transfers in or out of Level 3 are typically related to our heat rate options and long-dated energy transactions that extend beyond available quoted periods.

 

Financial Instruments Not Carried at Fair Value

 

The carrying value of our net accounts receivable, accounts payable and any short-term borrowings approximate fair value.  Our short-term borrowings are classified within Level 2 of the fair value hierarchy.  For our long-term debt fair values, see Note 2.

 

13.                               Nuclear Decommissioning Trusts

 

To fund the costs APS expects to incur to decommission Palo Verde, APS established external decommissioning trusts in accordance with NRC regulations.  Third-party investment managers are authorized to buy and sell securities per their stated investment guidelines.  The trust funds are invested in fixed income securities and equity securities.  APS classifies investments in decommissioning trust funds as available for sale.  As a result, we record the decommissioning trust funds at their fair value on our Condensed Consolidated Balance Sheets.  See Note 12 for a discussion of how fair value is determined and the classification of the nuclear decommissioning trust investments within the fair value hierarchy.  Because of the ability of APS to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, we have deferred realized and unrealized gains and losses (including other-than-temporary impairments on investment securities) in other regulatory liabilitiesThe following table includes the unrealized gains and losses based on the original cost of the investment and summarizes the fair value of APS’s nuclear decommissioning trust fund assets at March 31, 2013 and December 31, 2012 (dollars in millions):

 

 

 

Fair Value

 

Total
Unrealized
Gains

 

Total
Unrealized
Losses

 

March 31, 2013

 

 

 

 

 

 

 

Equity securities

 

$

226

 

$

87

 

$

 

Fixed income securities

 

379

 

21

 

(1

)

Net payables (a)

 

(9

)

 

 

Total

 

$

596

 

$

108

 

$

(1

)

 


(a)                                 Net payables relate to pending securities sales and purchases.

 

 

 

Fair Value

 

Total
Unrealized
Gains

 

Total
Unrealized
Losses

 

December 31, 2012

 

 

 

 

 

 

 

Equity securities

 

$

204

 

$

67

 

$

 

Fixed income securities

 

371

 

24

 

 

Net payables (a)

 

(4

)

 

 

Total

 

$

571

 

$

91

 

$

 

 

(a)                                 Net payables relate to pending securities sales and purchases.

 

39



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

The costs of securities sold are determined on the basis of specific identification.  The following table sets forth approximate realized gains and losses and proceeds from the sale of securities by the nuclear decommissioning trust funds (dollars in millions):

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Realized gains

 

$

2

 

$

2

 

Realized losses

 

(1

)

(1

)

Proceeds from the sale of securities (a)

 

135

 

92

 

 


(a)                                 Proceeds are reinvested in the trust.

 

The fair value of fixed income securities, summarized by contractual maturities, at March 31, 2013 is as follows (dollars in millions):

 

 

 

Fair Value

 

Less than one year

 

$

17

 

1 year - 5 years

 

105

 

5 years - 10 years

 

100

 

Greater than 10 years

 

157

 

Total

 

$

379

 

 

14.                               New Accounting Standards

 

During 2013, we adopted, on a retrospective basis, new guidance relating to balance sheet offsetting disclosures.  The new guidance requires enhanced disclosures regarding an entity’s ability to offset certain instruments on the balance sheet and how offsetting impacts the balance sheet.  The adoption of this guidance resulted in expanded disclosures relating to our derivative instruments (see Note 7), but did not impact our financial statement results.

 

During 2013, we also adopted, on a prospective basis, new guidance relating to reporting amounts reclassified from accumulated other comprehensive income.  This guidance requires new disclosures relating to accumulated other comprehensive income and how reclassifications from accumulated other comprehensive income impact net income.  As a result of adopting this new guidance, we have included a new footnote disclosure to provide the information required by the new standard (see Notes 15 and S-3).  The adoption of this guidance did not impact our financial statement results.

 

40



Table of Contents

 

PINNACLE WEST CAPITAL CORPORATION

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

15.                               Changes in Accumulated Other Comprehensive Loss

 

The following table shows the changes in accumulated other comprehensive loss, including reclassification adjustments, by component for the three-month period ended March 31, 2013 (dollars in thousands):

 

 

 

Derivative
Instruments

 

Pension and
Other
Postretirement
Benefits

 

Total

 

 

 

 

 

 

 

 

 

Beginning balance, January 1

 

$

(49,592

)

$

(64,416

)

$

(114,008

)

 

 

 

 

 

 

 

 

Other comprehensive income before reclassifications, net of tax expense of $38

 

58

 

 

58

 

 

 

 

 

 

 

 

 

Amounts reclassified from accumulated other comprehensive loss:

 

 

 

 

 

 

 

Net realized loss, net of tax benefit of $3,300

 

5,053

 

 

5,053

 

Amortization of actuarial loss, net of tax benefit of $582

 

 

890

 

890

 

Amortization of prior service cost, net of tax benefit of $49

 

 

76

 

76

 

 

 

 

 

 

 

 

 

Total reclassifications for the period, net of tax benefit of $3,300, $631 and $3,931

 

5,053

(a)

966

(b)

6,019

 

 

 

 

 

 

 

 

 

Net current period other comprehensive income, net of tax expense of $3,338, $631 and $3,969

 

5,111

 

966

 

6,077

 

 

 

 

 

 

 

 

 

Ending balance, March 31

 

$

(44,481

)

$

(63,450

)

$

(107,931

)

 


(a)         These amounts are included in the computation of fuel and purchased power costs and are subject to the PSA.  See Note 7.

(b)         These amounts are included in the computation of net periodic pension cost.  See Note 4.

 

41



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

CONDENSED CONSOLIDATED STATEMENTS OF INCOME

(unaudited)

(dollars in thousands)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

 

 

 

 

 

 

ELECTRIC OPERATING REVENUES

 

$

685,827

 

$

620,248

 

 

 

 

 

 

 

OPERATING EXPENSES

 

 

 

 

 

Fuel and purchased power

 

230,679

 

216,309

 

Operations and maintenance

 

220,752

 

208,447

 

Depreciation and amortization

 

103,706

 

100,085

 

Income taxes

 

16,060

 

(814

)

Taxes other than income taxes

 

39,768

 

42,226

 

Total

 

610,965

 

566,253

 

OPERATING INCOME

 

74,862

 

53,995

 

 

 

 

 

 

 

OTHER INCOME (DEDUCTIONS)

 

 

 

 

 

Income taxes

 

2,332

 

1,706

 

Allowance for equity funds used during construction

 

6,864

 

4,756

 

Other income (Note S-2)

 

1,343

 

510

 

Other expense (Note S-2)

 

(6,296

)

(4,624

)

Total

 

4,243

 

2,348

 

 

 

 

 

 

 

INTEREST EXPENSE

 

 

 

 

 

Interest on long-term debt

 

46,221

 

52,737

 

Interest on short-term borrowings

 

1,429

 

2,035

 

Debt discount, premium and expense

 

1,011

 

1,060

 

Allowance for borrowed funds used during construction

 

(3,990

)

(3,151

)

Total

 

44,671

 

52,681

 

 

 

 

 

 

 

NET INCOME

 

34,434

 

3,662

 

 

 

 

 

 

 

Less: Net income attributable to noncontrolling interests (Note 6)

 

8,392

 

7,767

 

 

 

 

 

 

 

NET INCOME (LOSS) ATTRIBUTABLE TO COMMON SHAREHOLDER

 

$

26,042

 

$

(4,105

)

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements and Supplemental Notes to Arizona Public Service Company’s Condensed Consolidated Financial Statements.

 

42



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(unaudited)

(dollars in thousands)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

 

 

 

 

 

 

NET INCOME

 

$

34,434

 

$

3,662

 

 

 

 

 

 

 

OTHER COMPREHENSIVE INCOME (LOSS), NET OF TAX

 

 

 

 

 

Derivative instruments:

 

 

 

 

 

Net unrealized gain (loss), net of tax benefit (expense) of ($38) and $16,554

 

58

 

(25,348

)

Reclassification of net realized loss, net of tax benefit of $3,300 and $5,728

 

5,052

 

8,772

 

Pension and other postretirement benefits activity, net of tax expense of $576 and $536

 

882

 

821

 

Total other comprehensive income (loss)

 

5,992

 

(15,755

)

 

 

 

 

 

 

COMPREHENSIVE INCOME (LOSS)

 

40,426

 

(12,093

)

Less: Comprehensive income attributable to noncontrolling interests

 

8,392

 

7,767

 

 

 

 

 

 

 

COMPREHENSIVE INCOME (LOSS) ATTRIBUTABLE TO COMMON SHAREHOLDER

 

$

32,034

 

$

(19,860

)

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements and Supplemental Notes to Arizona Public Service Company’s Condensed Consolidated Financial Statements.

 

43



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

CONDENSED CONSOLIDATED BALANCE SHEETS

(unaudited)

(dollars in thousands)

 

 

 

March 31,

 

December 31,

 

 

 

2013

 

2012

 

ASSETS

 

 

 

 

 

 

 

 

 

 

 

PROPERTY, PLANT AND EQUIPMENT

 

 

 

 

 

Plant in service and held for future use

 

$

14,490,460

 

$

14,342,501

 

Accumulated depreciation and amortization

 

(4,993,480

)

(4,925,990

)

Net

 

9,496,980

 

9,416,511

 

 

 

 

 

 

 

Construction work in progress

 

498,124

 

565,716

 

Palo Verde sale leaseback, net of accumulated depreciation (Note 6)

 

128,027

 

128,995

 

Intangible assets, net of accumulated amortization

 

162,823

 

161,995

 

Nuclear fuel, net of accumulated amortization

 

140,909

 

122,778

 

Total property, plant and equipment

 

10,426,863

 

10,395,995

 

 

 

 

 

 

 

INVESTMENTS AND OTHER ASSETS

 

 

 

 

 

Nuclear decommissioning trust (Note 13)

 

596,168

 

570,625

 

Assets from risk management activities (Note 7)

 

34,047

 

35,891

 

Other assets

 

32,120

 

31,650

 

Total investments and other assets

 

662,335

 

638,166

 

 

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

Cash and cash equivalents

 

7,328

 

3,499

 

Customer and other receivables

 

266,994

 

274,815

 

Accrued unbilled revenues

 

90,147

 

94,845

 

Allowance for doubtful accounts

 

(2,537

)

(3,340

)

Materials and supplies (at average cost)

 

223,605

 

218,096

 

Fossil fuel (at average cost)

 

35,211

 

31,334

 

Deferred fuel and purchased power regulatory asset (Note 3)

 

41,315

 

72,692

 

Other regulatory assets (Note 3)

 

52,872

 

71,257

 

Deferred income taxes

 

59,807

 

74,420

 

Assets from risk management activities (Note 7)

 

20,346

 

25,699

 

Other current assets

 

39,354

 

37,666

 

Total current assets

 

834,442

 

900,983

 

 

 

 

 

 

 

DEFERRED DEBITS

 

 

 

 

 

Regulatory assets (Note 3)

 

1,097,389

 

1,099,900

 

Unamortized debt issue costs

 

22,889

 

22,492

 

Income tax receivable (Note 5)

 

71,223

 

70,784

 

Other

 

114,903

 

114,222

 

Total deferred debits

 

1,306,404

 

1,307,398

 

 

 

 

 

 

 

TOTAL ASSETS

 

$

13,230,044

 

$

13,242,542

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements and Supplemental Notes to Arizona Public Service Company’s Condensed Consolidated Financial Statements.

 

44



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

CONDENSED CONSOLIDATED BALANCE SHEETS

(unaudited)

(dollars in thousands)

 

 

 

March 31,

 

December 31,

 

 

 

2013

 

2012

 

LIABILITIES AND EQUITY

 

 

 

 

 

 

 

 

 

 

 

CAPITALIZATION

 

 

 

 

 

Common stock

 

$

178,162

 

$

178,162

 

Additional paid-in capital

 

2,379,696

 

2,379,696

 

Retained earnings

 

1,650,277

 

1,624,237

 

Accumulated other comprehensive loss:

 

 

 

 

 

Pension and other postretirement benefits

 

(38,621

)

(39,503

)

Derivative instruments

 

(44,482

)

(49,592

)

Total shareholder equity

 

4,125,032

 

4,093,000

 

Noncontrolling interests (Note 6)

 

137,875

 

129,483

 

Total equity (Note S-1)

 

4,262,907

 

4,222,483

 

Long-term debt less current maturities

 

3,140,589

 

3,035,219

 

Palo Verde sale leaseback lessor notes less current maturities (Note 6)

 

38,869

 

38,869

 

Total capitalization

 

7,442,365

 

7,296,571

 

 

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

Commercial paper

 

 

92,175

 

Current maturities of long-term debt

 

122,828

 

122,828

 

Accounts payable

 

207,310

 

215,577

 

Accrued taxes (Note 5)

 

159,762

 

116,700

 

Accrued interest

 

44,649

 

49,135

 

Common dividends payable

 

 

59,800

 

Customer deposits

 

80,783

 

79,689

 

Liabilities from risk management activities (Note 7)

 

65,354

 

73,741

 

Regulatory liabilities (Note 3)

 

76,640

 

88,116

 

Other current liabilities

 

102,349

 

145,326

 

Total current liabilities

 

859,675

 

1,043,087

 

 

 

 

 

 

 

DEFERRED CREDITS AND OTHER

 

 

 

 

 

Deferred income taxes

 

2,109,332

 

2,133,976

 

Regulatory liabilities (Note 3)

 

805,230

 

759,201

 

Liability for asset retirements

 

358,184

 

357,097

 

Liabilities for pension and other postretirement benefits (Note 4)

 

994,365

 

1,017,556

 

Liabilities from risk management activities (Note 7)

 

82,876

 

85,264

 

Customer advances

 

108,986

 

109,359

 

Coal mine reclamation

 

119,044

 

118,860

 

Unrecognized tax benefits (Note 5)

 

72,047

 

70,932

 

Other

 

277,940

 

250,639

 

Total deferred credits and other

 

4,928,004

 

4,902,884

 

 

 

 

 

 

 

COMMITMENTS AND CONTINGENCIES (SEE NOTES)

 

 

 

 

 

 

 

 

 

 

 

TOTAL LIABILITIES AND EQUITY

 

$

13,230,044

 

$

13,242,542

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements and Supplemental Notes to Arizona Public Service Company’s Condensed Consolidated Financial Statements.

 

45



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS

(unaudited)

(dollars in thousands)

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

CASH FLOWS FROM OPERATING ACTIVITIES

 

 

 

 

 

Net income

 

$

34,434

 

$

3,662

 

Adjustments to reconcile net income to net cash provided by operating activities:

 

 

 

 

 

Depreciation and amortization including nuclear fuel

 

124,320

 

118,463

 

Deferred fuel and purchased power

 

31,194

 

46,754

 

Deferred fuel and purchased power amortization

 

1,122

 

(24,514

)

Allowance for equity funds used during construction

 

(6,864

)

(4,756

)

Deferred income taxes

 

12,756

 

(2,044

)

Change in derivative instruments fair value

 

333

 

1,985

 

Changes in current assets and liabilities:

 

 

 

 

 

Customer and other receivables

 

2,464

 

52,416

 

Accrued unbilled revenues

 

4,698

 

20,511

 

Materials, supplies and fossil fuel

 

(9,386

)

(13,753

)

Other current assets

 

(2,526

)

(3,847

)

Accounts payable

 

12,892

 

(39,812

)

Accrued taxes and income taxes receivable — net

 

43,323

 

42,039

 

Other current liabilities

 

(58,419

)

(53,449

)

Change in margin and collateral accounts — assets

 

933

 

(1,853

)

Change in margin and collateral accounts — liabilities

 

24,205

 

(32,950

)

Change in other long-term assets

 

(29,022

)

(21,656

)

Change in other long-term liabilities

 

41,760

 

27,557

 

Net cash flow provided by operating activities

 

228,217

 

114,753

 

CASH FLOWS FROM INVESTING ACTIVITIES

 

 

 

 

 

Capital expenditures

 

(182,859

)

(240,973

)

Contributions in aid of construction

 

14,912

 

13,871

 

Allowance for borrowed funds used during construction

 

(3,990

)

(3,151

)

Proceeds from nuclear decommissioning trust sales

 

135,240

 

92,047

 

Investment in nuclear decommissioning trust

 

(139,553

)

(96,360

)

Other

 

(470

)

(533

)

Net cash flow used for investing activities

 

(176,720

)

(235,099

)

CASH FLOWS FROM FINANCING ACTIVITIES

 

 

 

 

 

Issuance of long-term debt

 

104,307

 

319,081

 

Short-term borrowings — net

 

(92,175

)

216,600

 

Repayment of long-term debt

 

 

(375,727

)

Dividends paid on common stock

 

(59,800

)

(57,400

)

Net cash flow provided by (used for) financing activities

 

(47,668

)

102,554

 

NET INCREASE (DECREASE) IN CASH AND CASH EQUIVALENTS

 

3,829

 

(17,792

)

CASH AND CASH EQUIVALENTS AT BEGINNING OF PERIOD

 

3,499

 

19,873

 

CASH AND CASH EQUIVALENTS AT END OF PERIOD

 

$

7,328

 

$

2,081

 

Supplemental disclosure of cash flow information

 

 

 

 

 

Cash paid during the period for:

 

 

 

 

 

Interest, net of amounts capitalized

 

$

48,146

 

$

61,701

 

Significant non-cash investing and financing activities:

 

 

 

 

 

Accrued capital expenditures

 

$

6,575

 

$

13,622

 

 

See Notes to Pinnacle West’s Condensed Consolidated Financial Statements and Supplemental Notes to Arizona Public Service Company’s Condensed Consolidated Financial Statements.

 

46



Table of Contents

 

Certain notes to APS’s Condensed Consolidated Financial Statements are combined with the Notes to Pinnacle West’s Condensed Consolidated Financial Statements.  Listed below are the Condensed Consolidated Notes to Pinnacle West’s Condensed Consolidated Financial Statements, the majority of which also relate to APS’s Condensed Consolidated Financial Statements.  In addition, listed below are the Supplemental Notes that are required disclosures for APS and should be read in conjunction with Pinnacle West’s Condensed Consolidated Notes.

 

 

 

Condensed
Consolidated
Note
Reference

 

APS’s
Supplemental
Note
Reference

 

Consolidation and Nature of Operations

 

Note 1

 

 

Long-Term Debt and Liquidity Matters

 

Note 2

 

 

Regulatory Matters

 

Note 3

 

 

Retirement Plans and Other Benefits

 

Note 4

 

 

Income Taxes

 

Note 5

 

 

Palo Verde Sale Leaseback Variable Interest Entities

 

Note 6

 

 

Derivative Accounting

 

Note 7

 

 

Changes in Equity

 

Note 8

 

Note S-1

 

Commitments and Contingencies

 

Note 9

 

 

Other Income and Other Expense

 

Note 10

 

Note S-2

 

Earnings Per Share

 

Note 11

 

 

Fair Value Measurements

 

Note 12

 

 

Nuclear Decommissioning Trusts

 

Note 13

 

 

New Accounting Standards

 

Note 14

 

 

Changes in Accumulated Other Comprehensive Income

 

Note 15

 

Note S-3

 

 

47



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

S-1.                           Changes in Equity

 

The following tables show APS’s changes in shareholder equity and changes in equity of noncontrolling interests for the three months ended March 31, 2013 and 2012 (dollars in thousands):

 

 

 

Three Months Ended March 31, 2013

 

Three Months Ended March 31, 2012

 

 

 

Shareholder
Equity

 

Noncontrolling
Interests

 

Total

 

Shareholder
Equity

 

Noncontrolling
Interests

 

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Beginning balance, January 1

 

$

4,093,000

 

$

129,483

 

$

4,222,483

 

$

3,943,007

 

$

108,399

 

$

4,051,406

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net income (loss)

 

26,042

 

8,392

 

34,434

 

(4,105

)

7,767

 

3,662

 

OCI (loss)

 

5,992

 

 

5,992

 

(15,755

)

 

(15,755

)

Total comprehensive income (loss)

 

32,034

 

8,392

 

40,426

 

(19,860

)

7,767

 

(12,093

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dividends on common stock

 

 

 

 

(57,400

)

 

(57,400

)

Other

 

(2

)

 

(2

)

1

 

 

1

 

Ending balance, March 31

 

$

4,125,032

 

$

137,875

 

$

4,262,907

 

$

3,865,748

 

$

116,166

 

$

3,981,914

 

 

S-2.                           Other Income and Other Expense

 

The following table provides detail of APS’s other income and other expense for the three months ended March 31, 2013 and 2012 (dollars in thousands):

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Other income:

 

 

 

 

 

Interest income

 

$

23

 

$

107

 

Miscellaneous

 

1,320

 

403

 

Total other income

 

$

1,343

 

$

510

 

 

 

 

 

 

 

Other expense:

 

 

 

 

 

Non-operating costs (a)

 

$

(2,320

)

$

(1,741

)

Asset dispositions

 

(1,264

)

(223

)

Miscellaneous

 

(2,712

)

(2,660

)

Total other expense

 

$

(6,296

)

$

(4,624

)

 


(a)                                 As defined by the FERC, includes below-the-line non-operating utility expense (items excluded from utility rate recovery).

 

48



Table of Contents

 

ARIZONA PUBLIC SERVICE COMPANY

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

 

S-3.                           Changes in Accumulated Other Comprehensive Loss

 

The following table shows the changes in accumulated other comprehensive income (loss), including reclassification adjustments, by component for the three-month period ended March 31, 2013 (dollars in thousands):

 

 

 

Derivative
Instruments

 

Pension and
Other
Postretirement
Benefits

 

Total

 

 

 

 

 

 

 

 

 

Beginning balance, January 1

 

$

(49,592

)

$

(39,503

)

$

(89,095

)

 

 

 

 

 

 

 

 

Other comprehensive income before reclassifications, net of tax expense of $38

 

58

 

 

58

 

 

 

 

 

 

 

 

 

Amounts reclassified from accumulated other comprehensive loss:

 

 

 

 

 

 

 

Net realized loss, net of tax benefit of $3,300

 

5,052

 

 

5,052

 

Amortization of actuarial loss, net of tax benefit of $527

 

 

808

 

808

 

Amortization of prior service cost, net of tax benefit of $49

 

 

74

 

74

 

 

 

 

 

 

 

 

 

Total reclassifications for the period, net of tax benefit of $3,300, $576 and $3,876

 

5,052

(a)

882

(b)

5,934

 

 

 

 

 

 

 

 

 

Net current period other comprehensive income, net of tax expense of $3,338, $576 and $3,914

 

5,110

 

882

 

5,992

 

 

 

 

 

 

 

 

 

Ending balance, March 31

 

$

(44,482

)

$

(38,621

)

$

(83,103

)

 


(a)         These amounts are included in the computation of fuel and purchased power costs and are subject to the PSA.  See Note 7.

(b)         These amounts are included in the computation of net periodic pension cost.  See Note 4.

 

49



Table of Contents

 

ITEM 2.                        MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

INTRODUCTION

 

The following discussion should be read in conjunction with Pinnacle West’s Condensed Consolidated Financial Statements and APS’s Condensed Consolidated Financial Statements and the related Notes that appear in Item 1 of this report.  For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Part 1, Item 1A of the 2012 Form 10-K.

 

OVERVIEW

 

Pinnacle West owns all of the outstanding common stock of APS.  APS is a vertically-integrated electric utility that provides either retail or wholesale electric service to most of the state of Arizona, with the major exceptions of about one-half of the Phoenix metropolitan area, the Tucson metropolitan area and Mohave County in northwestern Arizona.  APS accounts for essentially all of our revenues and earnings, and is expected to continue to do so.

 

Areas of Business Focus

 

Operational Performance, Reliability and Recent Developments.

 

Nuclear.  APS operates and is a joint owner of Palo Verde.  APS management continues to work closely with regulators and others in the nuclear industry to analyze the lessons learned and address any rulemaking or improvements resulting from the March 2011 events impacting the Fukushima Daiichi Nuclear Power Station in Japan.

 

Coal and Related Environmental Matters.  APS is a joint owner of three coal-fired power plants and acts as operating agent for two of the plants.  APS is focused on the impacts on its coal fleet that may result from increased regulation and potential legislation concerning greenhouse gas emissions.  Concern over climate change and other emission-related issues could have a significant impact on our capital expenditures and operating costs in the form of taxes, emissions allowances or required equipment upgrades for these plants.  APS is closely monitoring its long-range capital management plans, understanding that any resulting regulation and legislation could impact the economic viability of certain plants, as well as the willingness or ability of power plant participants to fund any such equipment upgrades.

 

SCE, a participant in Four Corners, has indicated that certain California legislation may prohibit it from making emission control expenditures at the plant.  On November 8, 2010, APS and SCE entered into an asset purchase agreement (“Asset Purchase Agreement”), providing for the purchase by APS of SCE’s 48% interest in each of Units 4 and 5 of Four Corners.  The purchase price is $294 million, subject to certain adjustments.  Completion of the purchase by APS is subject to the receipt of approvals by the ACC, the California Public Utilities Commission (“CPUC”) and the FERC.  On March 29, 2012, the CPUC issued an order approving the sale.  On April 18, 2012, the ACC voted to allow APS to move forward with the purchase.  The Asset Purchase Agreement provides that the purchase price will be reduced by $7.5 million for each month between October 1, 2012 and the closing date.  The ACC reserved the right to review the prudence of the transaction for cost recovery purposes in a future proceeding if the purchase closes.  The ACC also authorized an accounting

 

50



Table of Contents

 

deferral of certain costs associated with the purchase until any such cost recovery proceeding concludes.  The FERC application seeking authorization for the transaction was approved on November 27, 2012.  The principal remaining condition to closing is the negotiation and execution of a new coal supply contract on terms reasonably acceptable to APS.

 

On December 19, 2012, BHP Billiton New Mexico Coal, Inc. (“BHP Billiton”), the parent company of BHP Navajo Coal Company (“BNCC”), the coal supplier and operator of the mine that serves Four Corners, announced that it has entered into a Memorandum of Understanding with the Navajo Nation setting out the key terms under which full ownership of BNCC would be sold to the Navajo Nation.  BHP Billiton would be retained by BNCC under contract as the mine manager and operator until July 2016.  Key terms of the new coal supply contract are being finalized by the Navajo Nation and APS and the other Four Corners co-owners.

 

As a result of this proposed change in ownership of BNCC, APS now expects that a new coal supply contract would be executed upon completion of negotiations and following the endorsement of the transfer of ownership of the stock of BNCC to a new Navajo Nation commercial enterprise to be established by the Navajo Nation Tribal Council.  On April 29, 2013, the Tribal Council approved the creation of the new commercial enterprise with sufficient power and authority to execute the transaction with BHP Billiton.

 

Pursuant to the Asset Purchase Agreement, either APS or SCE has a right to terminate the Agreement if satisfaction of the closing conditions had not occurred by December 31, 2012, unless the party seeking to terminate is then in breach of the Agreement.

 

APS, on behalf of the Four Corners participants, negotiated amendments to an existing facility lease with the Navajo Nation which extends the Four Corners leasehold interest from 2016 to 2041.  The Navajo Nation approved these amendments in March 2011.  The effectiveness of the amendments also requires the approval of the United States Department of the Interior (“DOI”), as does a related federal rights-of-way grant which the Four Corners participants will pursue.  A federal environmental review is underway as part of the DOI review process.

 

APS has announced that, if APS’s purchase of SCE’s interests in Units 4 and 5 at Four Corners is consummated, it will close Units 1, 2 and 3 at the plant.  APS owns 100% of Units 1-3.  These events will change the plant’s overall generating capacity from 2,100 MW to 1,540 MW and APS’s entitlement from the plant from 791 MW to 970 MW.  When the ACC approved APS moving forward with the purchase of Units 4 and 5, it also approved the recovery of any unrecovered costs associated with the closure of Units 1, 2 and 3.  The Settlement Agreement in APS’s most recent retail rate case allows APS to seek a rate adjustment to reflect the Four Corners transaction should the transaction close (see Note 3).

 

APS cannot predict whether the mutual right to terminate in the Asset Purchase Agreement will be exercised by a party to that agreement in the future, whether BHP Billiton and the Navajo Nation will consummate the transfer of ownership of BNCC, or whether the coal supply contract will be finalized and executed by the Four Corners co-owners, such that closing of APS’s purchase of SCE’s interest in Four Corners can occur.

 

Transmission and Delivery.  APS is working closely with regulators to identify and plan for transmission needs that continue to support system reliability, access to markets and renewable energy development.  The capital expenditures table presented in the “Liquidity and Capital Resources” section below includes the next three years of new transmission projects, along with other transmission

 

51



Table of Contents

 

costs for upgrades and replacements.  APS is also working to establish and expand smart grid technologies throughout its service territory designed to provide long-term benefits both to APS and its customers.  APS is piloting and deploying a variety of technologies that are intended to allow customers to better monitor their energy use and needs, minimize system outage durations as well as the number of customers that experience outages, and facilitate greater cost savings to APS through improved reliability and the automation of certain distribution functions, including remote meter reading and remote connects and disconnects.

 

Renewable Energy.  The ACC approved the RES in 2006.  The renewable energy requirement is 4% of retail electric sales in 2013 and increases annually until it reaches 15% in 2025.  In the settlement agreement related to the 2008 retail rate case, APS agreed to exceed the RES standards, committing to use APS’s best efforts to obtain 1,700 gigawatt hours (“GWh”) of new renewable resources to be in service by year-end 2015, in addition to its 2008 renewable resource commitments.  Taken together, APS’s commitment is currently estimated to be approximately 12% of APS’s estimated retail energy sales by year-end 2015, which is more than double the existing RES target of 5% for that year.  A component of the RES targets development of distributed energy systems (generally speaking, small-scale renewable technologies that are located on customers’ properties).

 

On June 29, 2012, APS filed its annual RES implementation plan, covering the 2013-2017 timeframe and requesting 2013 RES funding of $97 million to $107 million.  In a final order dated January 31, 2013, the ACC approved a budget of $103 million for APS’s 2013 RES plan.  That budget includes $4 million for residential distributed energy incentives and $0.1 million for commercial distributed energy up-front incentives, but did not include any funds for new commercial distributed energy production-based incentives beyond those for previously approved programs.  The ACC further ordered that a hearing take place to consider APS’s proposal to establish compliance with distributed energy requirements by tracking and recording distributed energy, rather than acquiring and retiring renewable energy credits.  The track and record approach would require monitoring the distributed energy systems that are connected to APS’s system, recording the amount of energy they produce, and reporting the energy production amounts to the ACC for informational purposes only.  Finally, the ACC authorized an APS-led multi-session technical conference designed to consider APS’s net metering policy and the costs and benefits of distributed energy.

 

APS has a diverse portfolio of existing and planned renewable resources totaling 1,131 MW, including solar, wind, geothermal, biomass and biogas.  Of this portfolio, 709 MW are currently in operation and 422 MW are under contract for development or are under construction.  Renewable resources in operation include 98 MW of solar facilities owned by APS, 349 MW of long-term purchased power agreements, and an estimated 262 MW of customer-sited, third-party owned distributed energy resources.

 

To achieve our RES requirements, as mentioned above, to date APS has entered into contracts for 422 MW of renewable resources that are planned, in development or under construction.  APS’s strategy to procure these resources includes new facilities to be owned by APS, purchased power contracts for new facilities and ongoing development of distributed energy resources.  APS has also entered into long-term purchased power agreements for 280 MW from solar facilities currently planned, in development or under construction, and 72 MW from distributed energy resources.

 

The following table summarizes APS’s renewable energy sources in operation and under development as of May 3, 2013.

 

52



Table of Contents

 

 

 

Net Capacity in Operation
(MW)

 

Net Capacity Planned / Under
Development (MW)

 

Total APS Owned: Solar (a)

 

98

 

70

 

 

 

 

 

 

 

Purchased Power Agreements:

 

 

 

 

 

Solar

 

30

 

280

 

Wind

 

289

 

 

Geothermal

 

10

 

 

Biomass

 

14

 

 

Biogas

 

6

 

 

Total Purchased Power Agreements

 

349

 

280

 

 

 

 

 

 

 

Total Distributed Energy: Solar

 

262

 

72

 

 

 

 

 

 

 

Total Renewable Portfolio

 

709

 

422

 

 


(a)         Through the ACC-approved AZ Sun Program, a program that contemplates the development of photovoltaic solar plants which APS owns or will own, APS has executed contracts for the development of 150 MW of new solar generation, representing an investment commitment of approximately $614 million.

 

Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection of the project to the electric grid.

 

Demand Side Management.  In recent years, Arizona regulators have placed an increased focus on energy efficiency and other demand side management programs to encourage customers to conserve energy, while incentivizing utilities to aid in these efforts that ultimately reduce the demand for energy.  In December 2009, the ACC initiated an Energy Efficiency rulemaking, with a proposed Energy Efficiency Standard of 22% cumulative annual energy savings by 2020.  The 22% figure represents the cumulative reduction in future energy usage through 2020 attributable to energy efficiency initiatives.  This ambitious standard became effective on January 1, 2011 and will likely impact Arizona’s future energy resource needs.  The ACC issued an order on April 4, 2012 approving recovery of approximately $72 million of APS’s energy efficiency and demand side management program costs.  This amount will be recovered by the then-existing DSMAC over a twelve-month period beginning March 1, 2012.  This amount does not include $10 million already being recovered in general retail base rates.

 

On June 1, 2012, APS filed its 2013 Demand Side Management Implementation Plan.  In 2013, the standards will require APS to achieve cumulative energy savings equal to 5% of its 2012 retail energy sales.  Later in 2012, APS filed a supplement to its plan that included a proposed budget for 2013 of $87.6 million.  APS expects to receive a decision from the ACC in the second quarter of 2013.

 

Rate Matters.  APS needs timely recovery through rates of its capital and operating expenditures to maintain its financial health.  APS’s retail rates are regulated by the ACC and its

 

53



Table of Contents

 

wholesale electric rates (primarily for transmission) are regulated by the FERC.  On June 1, 2011, APS filed a rate case with the ACC.  APS and other parties to the retail rate case subsequently entered into a Settlement Agreement detailing the terms upon which the parties have agreed to settle the rate case.  See Note 3 for details regarding the Settlement Agreement terms and for information on APS’s FERC rates.

 

APS has several recovery mechanisms in place that provide more timely recovery to APS of its fuel and transmission costs, and costs associated with the promotion and implementation of its demand side management and renewable energy efforts and customer programs.  These mechanisms are described more fully in Note 3.

 

As part of APS’s proposed acquisition of SCE’s interest in Units 4 and 5 of Four Corners, APS and SCE agreed that upon closing of the acquisition (or in 2016 if the closing does not occur), the companies will terminate an existing agreement that provides transmission capacity for SCE to transmit its portion of the output from Four Corners to California. On May 1, 2013, APS filed a request with FERC seeking authorization to cancel the existing agreement and defer a $40 million payment to be made by APS associated with the termination and recover the payment through amortization over a 10-year period.  APS believes the costs associated with the termination of the existing agreement are recoverable, but cannot predict whether FERC will approve our request; however, if the recovery is disallowed by FERC, APS would record a charge to its results of operations at the time of the disallowance.

 

Financial Strength and Flexibility.  Pinnacle West and APS currently have ample borrowing capacity under their respective credit facilities, and may readily access these facilities ensuring adequate liquidity for each company.  Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

 

Other Subsidiaries.  The operations of El Dorado are not expected to have any material impact on our financial results, or to require any material amounts of capital, over the next three years.  As a result of the continuing distressed conditions in the real estate markets, during 2009 our other first-tier subsidiary, SunCor, undertook a program to dispose of its homebuilding operations, master-planned communities, land parcels, commercial assets and golf courses in order to eliminate its outstanding debt.  In February 2012, SunCor filed for protection under the United States Bankruptcy Code to complete an orderly liquidation of its business.  On March 25, 2013, the bankruptcy plan submitted to the court and agreed to by SunCor and its creditors (the “Joint Plan”) became effective.  The Joint Plan provides for the full release of Pinnacle West and its affiliates from any and all claims related to SunCor, SunCor’s subsidiaries, and their respective estates.

 

Key Financial Drivers

 

In addition to the continuing impact of the matters described above, many factors influence our financial results and our future financial outlook, including those listed below.  We closely monitor these factors to plan for the Company’s current needs, and to adjust our expectations, financial budgets and forecasts appropriately.

 

Electric Operating Revenues.  For the years 2010 through 2012, retail electric revenues comprised approximately 93% of our total electric operating revenues.  Our electric operating revenues

 

54



Table of Contents

 

are affected by customer growth or decline, variations in weather from period to period, customer mix, average usage per customer and the impacts of energy efficiency programs, distributed energy additions, electricity rates and tariffs, the recovery of PSA deferrals and the operation of other recovery mechanisms.  These revenue transactions are affected by the availability of excess generation or other energy resources and wholesale market conditions, including competition, demand and prices.

 

Customer and Sales Growth.  Retail customer growth in APS’s service territory for the three-month period ended March 31, 2013 was 1.4% compared with the comparable prior-year period.  For the three years 2010 through 2012, APS’s customer growth averaged 0.7% per year.  We currently expect annual customer growth to average about 2% for 2013 through 2015 based on our assessment of modestly improving economic conditions, both nationally and in Arizona.  Retail electricity sales in kilowatt-hours, adjusted to exclude the effects of weather variations, increased 0.6% for the three-month period ended March 31, 2013 compared with the prior-year period, reflecting the effects of customer conservation and energy efficiency and distributed renewable generation initiatives, offset by mildly improving economic conditions.  For the three years 2010 through 2012, APS experienced annual declines in retail electricity sales averaging 0.1%, adjusted to exclude the effects of weather variations.  We currently estimate that annual retail electricity sales in kilowatt-hours will increase on average by less than one percent during 2013 through 2015, including the effects of customer conservation and energy efficiency and distributed renewable generation initiatives, but excluding the effects of weather variations.  A failure of the Arizona economy to continue to improve could further impact these estimates.

 

Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns, impacts of energy efficiency programs and growth in distributed generation, and responses to retail price changes.  Our experience indicates that a reasonable range of variation in our kilowatt-hour sales projection attributable to such economic factors under normal business conditions can result in increases or decreases in annual net income of up to $10 million.

 

Weather.  In forecasting the retail sales growth numbers provided above, we assume normal weather patterns based on historical data.  Historical extreme weather variations have resulted in annual variations in net income in excess of $20 million.  However, our experience indicates that the more typical variations from normal weather can result in increases or decreases in annual net income of up to $10 million.

 

Fuel and Purchased Power Costs.  Fuel and purchased power costs included on our Condensed Consolidated Statements of Income are impacted by our electricity sales volumes, existing contracts for purchased power and generation fuel, our power plant performance, transmission availability or constraints, prevailing market prices, new generating plants being placed in service in our market areas, changes in our generation resource allocation, our hedging program for managing such costs and PSA deferrals and the related amortization.

 

Operations and Maintenance ExpensesOperations and maintenance expenses are impacted by growth, power plant operations, maintenance of utility plant (including generation, transmission, and distribution facilities), inflation, outages, higher-trending pension and other postretirement benefit costs, renewable energy and demand side management related expenses (which are offset by the same amount of operating revenues) and other factors.  In the settlement agreement related to the 2008 retail rate case, APS committed to operational expense reductions from 2010 through 2014 and received approval to defer certain pension and other postretirement benefit cost increases incurred in 2011 and

 

55



Table of Contents

 

2012, which totaled $25 million, as a regulatory asset, until the most recent general retail rate case decision became effective on July 1, 2012.  In July 2012, we began amortizing the regulatory asset over a 36-month period.

 

Depreciation and Amortization Expenses.  Depreciation and amortization expenses are impacted by net additions to utility plant and other property (such as new generation, transmission, and distribution facilities), and changes in depreciation and amortization rates.  See “Capital Expenditures” below for information regarding the planned additions to our facilities.

 

Property Taxes.  Taxes other than income taxes consist primarily of property taxes, which are affected by the value of property in-service and under construction, assessment ratios, and tax rates.  The average property tax rate in Arizona for APS, which owns essentially all of our property, was 9.6% of the assessed value for 2012 and 9.0% for 2011.  We expect property taxes to increase as we add new generating units and continue with improvements and expansions to our existing generating units, transmission and distribution facilities.  (See Note 3 for property tax deferrals contained in the Settlement Agreement).

 

Income Taxes.  Income taxes are affected by the amount of pretax book income, income tax rates, certain deductions and non-taxable items, such as AFUDC.  In addition, income taxes may also be affected by the settlement of issues with taxing authorities.

 

Interest Expense.  Interest expense is affected by the amount of debt outstanding and the interest rates on that debt (see Note 2).  The primary factors affecting borrowing levels are expected to be our capital expenditures, long-term debt maturities, equity issuances and internally generated cash flow.  An allowance for borrowed funds used during construction offsets a portion of interest expense while capital projects are under construction.  We stop accruing AFUDC on a project when it is placed in commercial operation.

 

RESULTS OF OPERATIONS

 

Pinnacle West’s only reportable business segment is our regulated electricity segment, which consists of traditional regulated retail and wholesale electricity businesses (primarily electricity service to Native Load customers) and related activities and includes electricity generation, transmission and distribution.

 

Operating Results

 

Three-month period ended March 31, 2013 compared with three-month period ended March 31, 2012  Our consolidated net income attributable to common shareholders for the three months ended March 31, 2013 was $24 million, compared with a net loss of $8 million for the prior-year period.  The results reflect an increase of approximately $31 million for the regulated electricity segment primarily due to increases related to the retail regulatory settlement effective July 1, 2012 (see Note 3), the effects of weather, higher retail transmission revenues, higher retail sales due to customer growth and changes in customer usage patterns and related pricing, and lower net interest charges due to lower debt balances and lower interest rates in the current-year period.   These positive factors were partially offset by higher operations and maintenance expenses and higher income taxes in the current-year period.

 

The following table presents net income attributable to common shareholders by business segment compared with the prior-year period:

 

56



Table of Contents

 

 

 

Three Months Ended
March 31,

 

 

 

 

 

2013

 

2012

 

Net Change

 

 

 

(dollars in millions)

 

Regulated Electricity Segment:

 

 

 

 

 

 

 

Operating revenues less fuel and purchased power expenses

 

$

455

 

$

404

 

$

51

 

Operations and maintenance

 

(223

)

(211

)

(12

)

Depreciation and amortization

 

(104

)

(100

)

(4

)

Taxes other than income taxes

 

(40

)

(43

)

3

 

Other income (expenses), net

 

3

 

1

 

2

 

Interest charges, net of allowance for borrowed funds used during construction

 

(45

)

(53

)

8

 

Income taxes

 

(13

)

4

 

(17

)

Less income related to noncontrolling interests (Note 6)

 

(8

)

(8

)

 

Regulated electricity segment net income (loss)

 

25

 

(6

)

31

 

 

 

 

 

 

 

 

 

All other

 

(1

)

(1

)

 

Income (Loss) from Continuing Operations Attributable to Common Shareholders

 

24

 

(7

)

31

 

 

 

 

 

 

 

 

 

Loss from Discontinued Operations Attributable to Common Shareholders (a)

 

 

(1

)

1

 

 

 

 

 

 

 

 

 

Net Income (Loss) Attributable to Common Shareholders

 

$

24

 

$

(8

)

$

32

 

 


(a)                                 Includes activities related to SunCor.

 

Operating revenues less fuel and purchased power expenses Regulated electricity segment operating revenues less fuel and purchased power expenses were $51 million higher for the three months ended March 31, 2013 compared with the prior-year period.  The following table summarizes the major components of this change:

 

57



Table of Contents

 

 

 

Increase (Decrease)

 

 

 

Operating
revenues

 

Fuel and
purchased
power
expenses

 

Net change

 

 

 

(dollars in millions)

 

 

 

 

 

 

 

 

 

Impacts of retail regulatory settlement effective July 1, 2012

 

$

25

 

$

2

 

$

23

 

Effects of weather

 

19

 

7

 

12

 

Higher retail sales due to customer growth and changes in customer usage patterns and related pricing

 

11

 

1

 

10

 

Higher retail transmission revenues

 

10

 

 

10

 

Higher demand-side management, renewable energy and similar regulatory surcharges

 

6

 

2

 

4

 

Higher fuel and purchased power costs, net of related deferrals and off-system sales

 

(5

)

3

 

(8

)

Miscellaneous items, net

 

(1

)

(1

)

 

Total

 

$

65

 

$

14

 

$

51

 

 

Operations and maintenance Operations and maintenance expenses increased $12 million for the three months ended March 31, 2013 compared with the prior-year period primarily because of:

 

·                                          An increase of $8 million related to higher performance-based compensation costs resulting from an improved company stock price and estimated full-year performance;

 

·                                          An increase of $4 million related to employee benefit costs, comprised of an increase of $11 million related to amortization of certain pension and other postretirement benefit costs in 2013 compared with regulatory deferral of such costs in 2012, and a decrease of $7 million related to other employee benefit costs, primarily pension and other postretirement benefit costs;

 

·                                          An increase of $4 million in information technology costs;

 

·                                          A decrease of $6 million in generation costs, primarily due to lower power plant maintenance costs as a result of less work being completed early in the year compared to 2012; and

 

·                                          An increase of $2 million related to other miscellaneous factors.

 

Interest charges, net of allowance for borrowed funds used during construction Interest charges, net of allowance for borrowed funds used during construction, decreased $8 million for the three months ended March 31, 2013 compared with the prior-year period primarily because of lower debt balances and lower interest rates in the current year.

 

58



Table of Contents

 

Income taxes Income taxes were $17 million higher for the three months ended March 31, 2013 compared with the prior-year period primarily due to higher pretax income in the current period.

 

LIQUIDITY AND CAPITAL RESOURCES

 

Overview

 

Pinnacle West’s primary cash needs are for dividends to our shareholders and principal and interest payments on our indebtedness.  The level of our common stock dividends and future dividend growth will be dependent on declaration by our Board of Directors based on a number of factors, including our financial condition, payout ratio, free cash flow and other factors.

 

Our primary sources of cash are dividends from APS and external debt and equity issuances.  An ACC order requires APS to maintain a common equity ratio of at least 40%.  As defined in the ACC order, the common equity ratio is total shareholder equity divided by the sum of total shareholder equity and long-term debt, including current maturities of long-term debt.  At March 31, 2013, APS’s common equity ratio, as defined, was 56%.  Its total shareholder equity was approximately $4.1 billion, and total capitalization was approximately $7.4 billion.  Under this order, APS would be prohibited from paying dividends if such payment would reduce its total shareholder equity below approximately $2.9 billion, assuming APS’s total capitalization remains the same.  This restriction does not materially affect Pinnacle West’s ability to meet its ongoing cash needs or ability to pay dividends to shareholders.

 

APS’s capital requirements consist primarily of capital expenditures and maturities of long-term debt.  APS funds its capital requirements with cash from operations and, to the extent necessary, external debt financing and equity infusions from Pinnacle West.

 

Many of APS’s current capital expenditure projects qualify for bonus depreciation.  The American Taxpayer Relief Act of 2012, signed into law on January 2, 2013, includes provisions extending the eligibility for 50% bonus depreciation to qualified property placed in service in 2013.  As a result of this provision, and the previously enacted bonus depreciation provisions provided for in the Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010, total cash tax benefits of up to $400-$500 million are expected to be generated for APS through accelerated depreciation.  The cash generated is an acceleration of the tax benefits that APS would have otherwise received over 20 years.  It is anticipated that these cash benefits will be fully realized by APS by the end of 2013, with a majority of the benefit realized as of December 31, 2012.

 

Summary of Cash Flows

 

The following tables present net cash provided by (used for) operating, investing and financing activities for the three months ended March 31, 2013 and 2012 (dollars in millions):

 

59



Table of Contents

 

Pinnacle West Consolidated

 

 

 

Three Months Ended
March 31,

 

Net

 

 

 

2013

 

2012

 

Change

 

Net cash flow provided by operating activities

 

$

212

 

$

115

 

$

97

 

Net cash flow used for investing activities

 

(176

)

(235

)

59

 

Net cash flow provided by (used for) financing activities

 

(37

)

107

 

(144

)

Net decrease in cash and cash equivalents

 

$

(1

)

$

(13

)

$

12

 

 

Arizona Public Service Company

 

 

 

Three Months Ended
March 31,

 

Net

 

 

 

2013

 

2012

 

Change

 

Net cash flow provided by operating activities

 

$

228

 

$

115

 

$

113

 

Net cash flow used for investing activities

 

(176

)

(235

)

59

 

Net cash flow provided by (used for) financing activities

 

(48

)

102

 

(150

)

Net increase (decrease) in cash and cash equivalents

 

$

4

 

$

(18

)

$

22

 

 

Operating Cash Flows

 

Three-month period ended March 31, 2013 compared with three-month period ended March 31, 2012  Pinnacle West’s consolidated net cash provided by operating activities was $212 million in the first quarter of 2013, compared to $115 million in the first quarter of 2012, an increase of $97 million in net cash provided.  The increase is primarily related to a $60 million reduction of cash collateral posted, a $14 million decrease in cash paid for interest in the current year period, and other changes in working capital.

 

Other Pinnacle West sponsors a qualified defined benefit pension plan and a non-qualified supplemental excess benefit retirement plan for the employees of Pinnacle West and our subsidiaries.  The requirements of the Employee Retirement Security Act of 1974 (“ERISA”) require us to contribute a minimum amount to the qualified plan.  We contribute at least the minimum amount required under ERISA regulations, but no more than the maximum tax-deductible amount.  The minimum required funding takes into consideration the value of plan assets and our pension benefit obligations.  Under ERISA, the qualified pension plan was 105% funded as of January 1, 2012 and 101% funded as of January 1, 2013.  The assets in the plan are comprised of fixed-income, equity, real estate, and short-term investments.  Future year contribution amounts are dependent on plan asset performance and plan actuarial assumptions.  We have contributed $56 million to our pension plan year to date in 2013.  The minimum contributions for the pension plan due in 2013, 2014 and 2015 under the recently enacted Moving Ahead for Progress in the 21st Century Act (MAP-21) are estimated to be zero, $89 million and $112 million, respectively.  We expect to make voluntary contributions totaling $140 million to the pension plan in 2013, and contributions up to approximately $175 million in each of 2014 and 2015.  The contributions to our other postretirement benefit plans for 2013, 2014 and 2015 are expected to be approximately $20 million each year.

 

The $71 million long-term income tax receivable on the Condensed Consolidated Balance Sheets represents the anticipated refunds related to an APS tax accounting method change approved by the IRS in the third quarter of 2009.  This amount is classified as long-term, as there remains

 

60



Table of Contents

 

uncertainty regarding the timing of this cash receipt.  Further clarification of the timing is expected from the IRS within the next twelve months.

 

Investing Cash Flows

 

Three-month period ended March 31, 2013 compared with three-month period ended March 31, 2012  Pinnacle West’s consolidated net cash used for investing activities was $176 million in the first quarter of 2013, compared to $235 million in the first quarter of 2012, a decrease of $59 million in net cash used.  The decrease in net cash used for investing activities is primarily due to a decrease of approximately $58 million in capital expenditures.

 

Capital Expenditures The following table summarizes the estimated capital expenditures for the next three years:

 

Capital Expenditures

(dollars in millions)

 

 

 

Estimated for the Year Ended
December 31,

 

 

 

2013

 

2014

 

2015

 

APS

 

 

 

 

 

 

 

Generation:

 

 

 

 

 

 

 

Nuclear Fuel

 

$

55

 

$

82

 

$

83

 

Renewables

 

192

 

39

 

 

Environmental

 

20

 

71

 

198

 

Four Corners Units 4 and 5

 

253

 

 

 

Other Generation

 

144

 

252

 

333

 

Distribution

 

256

 

307

 

310

 

Transmission

 

149

 

211

 

200

 

Other (a)

 

47

 

68

 

66

 

Total APS

 

$

1,116

 

$

1,030

 

$

1,190

 

 


(a)                                 Primarily information systems and facilities projects.

 

Generation capital expenditures are comprised of various improvements to APS’s existing fossil and nuclear plants.  Examples of the types of projects included in this category are additions, upgrades and capital replacements of various power plant equipment, such as turbines, boilers and environmental equipment.  For purposes of this table, we have assumed the consummation of APS’s purchase of SCE’s interest in Four Corners Units 4 and 5 and the subsequent shutdown of Units 1-3, as discussed in the “Overview” section above.  As a result, we included the estimated $253 million purchase price under Generation and have not included environmental expenditures for Units 1-3.  We have not included estimated costs for Cholla’s compliance with EPA’s regional haze rule since we have challenged the rule judicially and are considering our future options with respect to that plant if the rule is upheld.  We are also monitoring the status of certain environmental matters, which, depending on their final outcome, could require modification to our environmental expenditures.

 

61



Table of Contents

 

Distribution and transmission capital expenditures are comprised of infrastructure additions and upgrades, capital replacements, and new customer construction.  Examples of the types of projects included in the forecast include power lines, substations, and line extensions to new residential and commercial developments.

 

Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

 

Financing Cash Flows and Liquidity

 

Three-month period ended March 31, 2013 compared with three-month period ended March 31, 2012  Pinnacle West’s consolidated net cash used for financing activities was $37 million in the first quarter of 2013, compared to $107 million of net cash provided in the first quarter of 2012, an increase of $144 million in net cash used.  The increase in net cash used for financing activities is primarily due to a $309 million net change in APS’s short-term borrowings and $215 million in lower issuances of long-term debt, partially offset by $376 million in lower repayments of long-term debt (see below).

 

Significant Financing Activities On April 17, 2013, the Pinnacle West Board of Directors declared a quarterly dividend of $0.545 per share of common stock, payable on June 3, 2013, to shareholders of record on May 1, 2013.

 

On March 22, 2013, APS issued an additional $100 million par amount of its outstanding 4.50% unsecured senior notes that mature on April 1, 2042.  The net proceeds from the sale were used to repay short-term commercial paper borrowings and replenish cash used to redeem certain tax-exempt indebtedness in November 2012.

 

On May 1, 2013, APS purchased all $32 million of the Maricopa County, Arizona Pollution Control Corporation Pollution Control Revenue Refunding Bonds, 2009 Series C, due 2029.  We expect to remarket these bonds within the next twelve months.  These bonds are classified as current maturities of long-term debt on our Condensed Consolidated Balance Sheets at March 31, 2013 and December 31, 2012.

 

Available Credit Facilities Pinnacle West and APS maintain committed revolving credit facilities in order to enhance liquidity and provide credit support for their commercial paper programs.

 

At March 31, 2013, Pinnacle West’s $200 million credit facility, which matures in November 2016, was available to refinance indebtedness of the Company and for other general corporate purposes, including credit support for its $200 million commercial paper program.  Pinnacle West has the option to increase the amount of the facility up to a maximum of $300 million upon the satisfaction of certain conditions and with the consent of the lenders.  At March 31, 2013, Pinnacle West had no outstanding borrowings under its credit facility, no letters of credit outstanding, and no commercial paper borrowings.

 

At March 31, 2013, APS had two credit facilities totaling $1 billion, including a $500 million credit facility that was refinanced in April 2013 (see below) and a $500 million facility that matures in November 2016.  APS may increase the amount of each facility up to a maximum of $700 million upon the satisfaction of certain conditions and with the consent of the lenders.  APS will use these facilities to refinance indebtedness and for other general corporate purposes.  Interest rates are based on APS’s senior unsecured debt credit ratings.

 

62



Table of Contents

 

On April 9, 2013, APS refinanced its $500 million revolving credit facility that would have matured in February 2015, with a new $500 million facility.  The new revolving credit facility terminates in April 2018.

 

The facilities described above are available to support APS’s $250 million commercial paper program, for bank borrowings or for issuances of letters of credit.  At March 31, 2013, APS had no outstanding borrowings or outstanding letters of credit under these credit facilities, nor did it have any commercial paper borrowings.

 

See “Financial Assurances” in Note 9 for a discussion of APS’s separate outstanding letters of credit.

 

Other Financing Matters  See Note 3 for information regarding the PSA approved by the ACC.

 

See Note 3 for information regarding the settlement related to the 2008 retail rate case, which includes ACC authorization and requirements of equity infusions into APS of at least $700 million by December 31, 2014 ($253 million of which was infused into APS from proceeds of a Pinnacle West equity issuance in 2010).

 

See Note 7 for information related to the change in our margin accounts.

 

Debt Provisions

 

Pinnacle West’s and APS’s debt covenants related to their respective bank financing arrangements include maximum debt to capitalization ratios.  Pinnacle West and APS comply with this covenant.  For both Pinnacle West and APS, this covenant requires that the ratio of consolidated debt to total consolidated capitalization not exceed 65%.  At March 31, 2013, the ratio was approximately 46% for Pinnacle West and 45% for APS.  Failure to comply with such covenant levels would result in an event of default which, generally speaking, would require the immediate repayment of the debt subject to the covenants and could cross-default other debt.  See further discussion of “cross-default” provisions below.

 

Neither Pinnacle West’s nor APS’s financing agreements contain “rating triggers” that would result in an acceleration of the required interest and principal payments in the event of a rating downgrade.  However, our bank credit agreements contain a pricing grid in which the interest rates we pay for borrowings thereunder are determined by our current credit ratings.

 

All of Pinnacle West’s loan agreements contain “cross-default” provisions that would result in defaults and the potential acceleration of payment under these loan agreements if Pinnacle West or APS were to default under certain other material agreements.  All of APS’s bank agreements contain cross-default provisions that would result in defaults and the potential acceleration of payment under these bank agreements if APS were to default under certain other material agreements.  Pinnacle West and APS do not have a material adverse change restriction for credit facility borrowings.

 

See Note 2 for further discussions of liquidity matters.

 

63



Table of Contents

 

Credit Ratings

 

The ratings of securities of Pinnacle West and APS as of April 26, 2013 are shown below.  We are disclosing these credit ratings to enhance understanding of our cost of short-term and long-term capital and our ability to access the markets for liquidity and long-term debt.  The ratings reflect the respective views of the rating agencies, from which an explanation of the significance of their ratings may be obtained.  There is no assurance that these ratings will continue for any given period of time.  The ratings may be revised or withdrawn entirely by the rating agencies if, in their respective judgments, circumstances so warrant.  Any downward revision or withdrawal may adversely affect the market price of Pinnacle West’s or APS’s securities and/or result in an increase in the cost of, or limit access to, capital.  Such revisions may also result in substantial additional cash or other collateral requirements related to certain derivative instruments, insurance policies, natural gas transportation, fuel supply, and other energy-related contracts.  At this time, we believe we have sufficient available liquidity resources to respond to a downward revision to our credit ratings.

 

 

 

Moody’s

 

Standard & Poor’s

 

Fitch

Pinnacle West

 

 

 

 

 

 

Corporate credit rating

 

Baa2

 

BBB+

 

BBB

Commercial paper

 

P-3

 

A-2

 

F3

Outlook

 

Stable

 

Stable

 

Stable

 

 

 

 

 

 

 

APS

 

 

 

 

 

 

Corporate credit rating

 

Baa1

 

BBB+

 

BBB

Senior unsecured

 

Baa1

 

BBB+

 

BBB+

Secured lease obligation bonds

 

Baa1

 

BBB+

 

BBB+

Commercial paper

 

P-2

 

A-2

 

F3

Outlook

 

Stable

 

Stable

 

Stable

 

Off-Balance Sheet Arrangements

 

See Note 6 for a discussion of the impacts on our financial statements of consolidating certain VIEs.

 

Financial Assurances

 

See “Financial Assurances” in Note 9 for a discussion of APS’s outstanding letters of credit.  Pinnacle West has also issued parental guarantees and surety bonds for APS, which were not material at March 31, 2013.

 

Contractual Obligations

 

There have been no material changes outside the normal course of business in contractual obligations from the information provided in our 2012 Form 10-K.

 

CRITICAL ACCOUNTING POLICIES

 

In preparing the financial statements in accordance with GAAP, management must often make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, expenses and related disclosures at the date of the financial statements and during the reporting period.  Some of those judgments can be subjective and complex, and actual results could differ from those estimates.

 

64



Table of Contents

 

There have been no changes to our critical accounting policies since our 2012 Form 10-K.  See “Critical Accounting Policies” in Item 7 of the 2012 Form 10-K for further details about our critical accounting policies.

 

OTHER ACCOUNTING MATTERS

 

See Note 14 for adoption of new accounting guidance relating to balance sheet offsetting disclosures, and reclassifications of accumulated other comprehensive income disclosures.

 

MARKET AND CREDIT RISKS

 

Market Risks

 

Our operations include managing market risks related to changes in interest rates, commodity prices and investments held by our nuclear decommissioning trust fund and benefit plan assets.

 

Interest Rate and Equity Risk

 

We have exposure to changing interest rates.  Changing interest rates will affect interest paid on variable-rate debt and the market value of fixed income securities held by our nuclear decommissioning trusts (see Notes 12 and 13) and benefit plan assets.  The nuclear decommissioning trusts and benefit plan assets also have risks associated with the changing value of their investments.  Nuclear decommissioning and benefit plan costs are recovered in regulated electricity prices.

 

Commodity Price Risk

 

We are exposed to the impact of market fluctuations in the commodity price and transportation costs of electricity and natural gas.  Our risk management committee, consisting of officers and key management personnel, oversees company-wide energy risk management activities to ensure compliance with our stated energy risk management policies.  We manage risks associated with these market fluctuations by utilizing various commodity instruments that may qualify as derivatives, including futures, forwards, options and swaps.  As part of our risk management program, we use such instruments to hedge purchases and sales of electricity and fuels.  The changes in market value of such contracts have a high correlation to price changes in the hedged commodities.

 

The following table shows the net pretax changes in mark-to-market of our derivative positions for the three months ended March 31, 2013 and 2012 (dollars in millions):

 

65



Table of Contents

 

 

 

Three Months Ended
March 31,

 

 

 

2013

 

2012

 

Mark-to-market of net positions at beginning of period

 

$

(122

)

$

(222

)

Recognized in earnings (a):

 

 

 

 

 

Change in mark-to-market losses for future period deliveries

 

 

(2

)

Decrease (increase) in regulatory asset

 

20

 

(14

)

Recognized in OCI:

 

 

 

 

 

Change in mark-to-market losses for future period deliveries (b)

 

 

(42

)

Mark-to-market losses realized during the period

 

8

 

15

 

Change in valuation techniques

 

 

 

Mark-to-market of net positions at end of period

 

$

(94

)

$

(265

)

 


(a)                                Represents the amounts reflected in income after the effect of PSA deferrals.

(b)                                 The changes in mark-to-market recorded in OCI are due primarily to changes in forward natural gas prices.

 

The table below shows the fair value of maturities of our derivative contracts (dollars in millions and excluding margin and collateral) at March 31, 2013 by maturities and by the type of valuation that is performed to calculate the fair values, classified in their entirety based on the lowest level of input that is significant to the fair value measurement.  See Note 1, “Derivative Accounting” and “Fair Value Measurements,” in Item 8 of our 2012 Form 10-K and Note 12 for more discussion of our valuation methods.

 

Source of Fair Value

 

2013

 

2014

 

2015

 

2016

 

2017

 

Years
thereafter

 

Total fair
value

 

Observable prices provided by other external sources

 

$

(24

)

$

(16

)

$

(1

)

$

 

$

 

$

 

$

(41

)

Prices based on unobservable inputs

 

(11

)

(11

)

(12

)

(8

)

(4

)

(7

)

(53

)

Total by maturity

 

$

(35

)

$

(27

)

$

(13

)

$

(8

)

$

(4

)

$

(7

)

$

(94

)

 

The table below shows the impact that hypothetical price movements of 10% would have on the market value of our risk management assets and liabilities included on Pinnacle West’s Condensed Consolidated Balance Sheets at March 31, 2013 and December 31, 2012 (dollars in millions):

 

66



Table of Contents

 

Mark-to-market changes

 

March 31, 2013
Gain (Loss)

 

December 31, 2012
Gain (Loss)

 

reported in:

 

Price Up 10%

 

Price Down 10%

 

Price Up 10%

 

Price Down 10%

 

Regulatory asset (liability) or OCI (a)

 

 

 

 

 

 

 

 

 

Electricity

 

$

7

 

$

(7

)

$

7

 

$

(7

)

Natural gas

 

25

 

(25

)

25

 

(25

)

Total

 

$

32

 

$

(32

)

$

32

 

$

(32

)

 


(a)                                 These contracts are hedges of our forecasted purchases of natural gas and electricity.  The impact of these hypothetical price movements would substantially offset the impact that these same price movements would have on the physical exposures being hedged.  To the extent the amounts are eligible for inclusion in the PSA, the amounts are recorded as either a regulatory asset or liability.

 

Credit Risk

 

We are exposed to losses in the event of non-performance or non-payment by counterparties.  See Note 12 for a discussion of our credit valuation adjustment policy.  See Note 7 for a further discussion of credit risk.

 

Item 3.                                                         QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

 

See “Key Financial Drivers” and “Market and Credit Risks” in Item 2 above for a discussion of quantitative and qualitative disclosures about market risks.

 

Item 4.                                                         CONTROLS AND PROCEDURES

 

(a)                                 Disclosure Controls and Procedures

 

The term “disclosure controls and procedures” means controls and other procedures of a company that are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) (15 U.S.C. 78a et seq.), is recorded, processed, summarized and reported, within the time periods specified in the United States Securities and Exchange Commission’s (“SEC’s”) rules and forms.  Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to a company’s management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

 

Pinnacle West’s management, with the participation of Pinnacle West’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of Pinnacle West’s disclosure controls and procedures as of March 31, 2013.  Based on that evaluation, Pinnacle West’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, Pinnacle West’s disclosure controls and procedures were effective.

 

67



Table of Contents

 

APS’s management, with the participation of APS’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of APS’s disclosure controls and procedures as of March 31, 2013.  Based on that evaluation, APS’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, APS’s disclosure controls and procedures were effective.

 

(b)                                 Changes in Internal Control Over Financial Reporting

 

The term “internal control over financial reporting” (defined in SEC Rule 13a-15(f)) refers to the process of a company that is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP.

 

No change in Pinnacle West’s or APS’s internal control over financial reporting occurred during the fiscal quarter ended March 31, 2013 that materially affected, or is reasonably likely to materially affect, Pinnacle West’s or APS’s internal control over financial reporting.

 

68



Table of Contents

 

PART II — OTHER INFORMATION

 

Item 1.                                                         LEGAL PROCEEDINGS

 

See “Environmental Matters” in Item 5 below and “Business of Arizona Public Service Company — Environmental Matters” in Item 1 of the 2012 Form 10-K in regard to pending or threatened litigation and other disputes.

 

See Note 3 for ACC and FERC-related matters.

 

See Note 9 for information regarding environmental and climate change matters, Superfund-related matters and matters related to a September 2011 power outage.

 

Item 1A.                                                RISK FACTORS

 

In addition to the other information set forth in this report, you should carefully consider the factors discussed in Part I, Item 1A — Risk Factors in the 2012 Form 10-K, which could materially affect the business, financial condition, cash flows or future results of Pinnacle West and APS.  The risks described in the 2012 Form 10-K are not the only risks facing Pinnacle West and APS.  Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial also may materially adversely affect the business, financial condition, cash flows and/or operating results of Pinnacle West and APS.

 

Item 2.                                                         UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

 

Issuer Purchases of Equity Securities

 

The following table contains information about our purchases of our common stock during the first quarter of 2013.

 

Period

 

Total
Number of
Shares
Purchased
(a)

 

Average
Price Paid
per Share

 

Total Number of
Shares Purchased
as Part of Publicly
Announced Plans
or Programs

 

Maximum Number of
Shares that May Yet Be
Purchased Under the
Plans or Programs

 

January 1 — January 31, 2013

 

 

 

 

 

February 1 — February 28, 2013

 

114,694

 

$

54.91

 

 

 

March 1 — March 31, 2013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

114,694

 

$

54.91

 

 

 

 


(a)         Represents shares of common stock withheld by Pinnacle West to satisfy tax withholding obligations upon the vesting of restricted stock.

 

69



Table of Contents

 

Item 5.                                                         OTHER INFORMATION

 

Environmental Matters

 

EPA Environmental Regulation

 

Regional Haze Rules — Four Corners.  On October 22, 2012, WildEarth Guardians filed a petition for review in the United States Court of Appeals for the Ninth Circuit alleging EPA violated the Endangered Species Act (“ESA”) when it promulgated the final Four Corners BART FIP.  On November 21, 2012, APS filed a motion for leave to intervene as a defendant, and the court granted the motion on December 10, 2012.  On December 12, 2012, EPA and APS filed motions with the court to dismiss the petition or, in the alternative, transfer the case to the United States Court of Appeals for the Tenth Circuit, the circuit in which APS believes the petition should have been filed.  On February 25, 2013, the court denied the motion to dismiss, but ordered that the case be transferred to the Tenth Circuit.  We cannot currently predict the outcome of this case or whether such outcome will have a material adverse impact on our financial position, results of operations, or cash flows.

 

Effluent Limitation Guidelines.  On April 19, 2013, EPA proposed revised effluent limitation guidelines establishing technology-based wastewater discharge limitations for fossil-fired electric generating units.  EPA’s proposal offers numerous options (four of which are “preferred alternatives”) that target metals and other pollutants in wastewater streams originating from fly ash and bottom ash handling activities, scrubber activities, and non-chemical metal cleaning wastes operations.  The preferred alternatives differ with respect to the scope of requirements that would be applicable to existing discharges of pollutants found in wastestreams generated at existing power plants.  All four alternatives would establish a “zero discharge” effluent limit for all pollutants in fly ash transport water.  However, requirements governing bottom ash transport water differ depending on which alternative EPA ultimately chooses and could range from effluent limits based on Best Available Technology Economically Achievable (BAT) to “zero discharge” effluent limits.  Depending on which alternative EPA finalizes, Four Corners may be required to change equipment and operating practices affecting boilers and ash handling systems, as well as change its waste disposal techniques.  We cannot currently predict the shape of EPA’s final rule or whether this action will have a material adverse impact on our financial position, results of operations, or cash flows.  EPA is subject to a consent decree deadline to finalize the revised guidelines by May 22, 2014.

 

Union Matters

 

As previously discussed in Part 1, Item 1 — “Business — Other Information” in the 2012 Form 10-K, the Palo Verde security officers changed their collective bargaining representative from the Security, Police and Fire Professionals of America to the United Security Professionals of America (“USPA”).  The Company is currently engaged in negotiations with the USPA regarding a new collective bargaining agreement.  The Company cannot predict the outcome of these negotiations.

 

70



Table of Contents

 

Item 6.                                                         EXHIBITS

 

(a)                                 Exhibits

 

Exhibit No.

 

Registrant(s)

 

Description

 

 

 

 

 

10.1

 

APS

 

Five-Year Credit Agreement dated as of April 9, 2013 among APS, as Borrower, Barclays Bank PLC, as Agent, and the lenders and other parties thereto

 

 

 

 

 

12.1

 

Pinnacle West

 

Ratio of Earnings to Fixed Charges

 

 

 

 

 

12.2

 

APS

 

Ratio of Earnings to Fixed Charges

 

 

 

 

 

12.3

 

Pinnacle West

 

Ratio of Earnings to Combined Fixed Charges and Preferred Stock Dividend Requirements

 

 

 

 

 

31.1

 

Pinnacle West

 

Certificate of Donald E. Brandt, Chief Executive Officer, pursuant to Rule 13a-14(a) and Rule 15d-14(a) of the Securities Exchange Act, as amended

 

 

 

 

 

31.2

 

Pinnacle West

 

Certificate of James R. Hatfield, Executive Vice President and Chief Financial Officer, pursuant to Rule 13a-14(a) and Rule 15d-14(a) of the Securities Exchange Act, as amended

 

 

 

 

 

31.3

 

APS

 

Certificate of Donald E. Brandt, Chief Executive Officer, pursuant to Rule 13a-14(a) and Rule 15d-14(a) of the Securities Exchange Act, as amended

 

 

 

 

 

31.4

 

APS

 

Certificate of James R. Hatfield, Executive Vice President and Chief Financial Officer, pursuant to Rule 13a-14(a) and Rule 15d-14(a) of the Securities Exchange Act, as amended

 

 

 

 

 

32.1*

 

Pinnacle West

 

Certification of Chief Executive Officer and Chief Financial Officer, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

 

 

 

 

 

32.2*

 

APS

 

Certification of Chief Executive Officer and Chief Financial Officer, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

 

 

 

 

 

101.INS*

 

Pinnacle West
APS

 

XBRL Instance Document

 

71



Table of Contents

 

Exhibit No.

 

Registrant(s)

 

Description

 

 

 

 

 

101.SCH*

 

Pinnacle West

APS

 

XBRL Taxonomy Extension Schema Document

 

 

 

 

 

101.CAL*

 

Pinnacle West

APS

 

XBRL Taxonomy Extension Calculation Linkbase Document

 

 

 

 

 

101.LAB*

 

Pinnacle West

APS

 

XBRL Taxonomy Extension Label Linkbase Document

 

 

 

 

 

101.PRE*

 

Pinnacle West

APS

 

XBRL Taxonomy Extension Presentation Linkbase Document

 

 

 

 

 

101.DEF*

 

Pinnacle West

APS

 

XBRL Taxonomy Definition Linkbase Document

 


*Furnished herewith as an Exhibit.

 

72



Table of Contents

 

In addition, Pinnacle West and APS hereby incorporate the following Exhibits pursuant to Exchange Act Rule 12b-32 and Regulation §229.10(d) by reference to the filings set forth below:

 

Exhibit
No.

 

Registrant(s)

 

Description

 

Previously Filed as
Exhibit(1)

 

Date
Filed

 

 

 

 

 

 

 

 

 

3.1

 

Pinnacle West

 

Pinnacle West Capital Corporation Bylaws, amended as of May 19, 2010

 

3.1 to Pinnacle West/APS June 30, 2010 Form 10-Q Report, File Nos. 1-8962 and 1-4473

 

8-3-10

 

 

 

 

 

 

 

 

 

3.2

 

Pinnacle West

 

Articles of Incorporation, restated as of May 21, 2008

 

3.1 to Pinnacle West/APS June 30, 2008 Form 10-Q Report, File Nos. 1-8962 and 1-4473

 

8-7-08

 

 

 

 

 

 

 

 

 

3.3

 

APS

 

Articles of Incorporation, restated as of May 25, 1988

 

4.2 to APS’s Form S-3 Registration Nos. 33-33910 and 33-55248 by means of September 24, 1993 Form 8-K Report, File No. 1-4473

 

9-29-93

 

 

 

 

 

 

 

 

 

3.4

 

APS

 

Amendment to the Articles of Incorporation of Arizona Public Service Company, amended May 16, 2012

 

3.1 to Pinnacle West/APS May 22, 2012 Form 8-K Report, File Nos. 1-8962 and 1-4473

 

5-22-12

 

 

 

 

 

 

 

 

 

3.5

 

APS

 

Arizona Public Service Company Bylaws, amended as of December 16, 2008

 

3.4 to Pinnacle West/APS December 31, 2008 Form 10-K, File Nos. 1-8962 and 1-4473

 

2-20-09

 

 

 

 

 

 

 

 

 

 


(1)  Reports filed under File Nos. 1-4473 and 1-8962 were filed in the office of the Securities and Exchange Commission located in Washington, D.C.

 

73



Table of Contents

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, each registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 

 

 

PINNACLE WEST CAPITAL CORPORATION

 

(Registrant)

 

 

 

 

 

 

Dated:

May 3, 2013

By:

/s/ James R. Hatfield

 

 

James R. Hatfield

 

 

Executive Vice President and

 

 

Chief Financial Officer

 

 

(Principal Financial Officer and

 

 

Officer Duly Authorized to sign this Report)

 

 

 

 

 

ARIZONA PUBLIC SERVICE COMPANY

 

(Registrant)

 

 

 

 

Dated:

May 3, 2013

By:

/s/ James R. Hatfield

 

 

James R. Hatfield

 

 

Executive Vice President and

 

 

Chief Financial Officer

 

 

(Principal Financial Officer and

 

 

Officer Duly Authorized to sign this Report)

 

74